Overview
Tabuaco wastewater treatment plant serves the town of Tabuaço in Portugal. With a secondary treatment level, it handles a population equivalent of 3,600 and has a designed capacity of 3,605 m³/day.
Tabuaco wastewater treatment plant is located in Tabuaço, a town in the Viseu district of Portugal. The facility serves a population of approximately 3,600 and is designed to treat up to 3,605 cubic meters of wastewater per day, with a current discharge volume of 600.23 cubic meters. The plant provides secondary treatment, which is the standard level required under the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations with a population equivalent between 2,000 and 10,000. This directive ensures that wastewater is treated to remove organic matter and suspended solids before discharge. The treated effluent is discharged into the local watershed, which ultimately drains into the Douro River basin. The Douro River flows through northern Portugal and Spain, supporting diverse aquatic life and providing water for agriculture and human consumption. The plant's inland location reduces direct marine impact, but its discharge contributes to the overall water quality of the Douro catchment.
Environmental context
The plant discharges into the Douro River basin, which flows westward through Portugal to the Atlantic Ocean near Porto. The Douro is a major river supporting diverse aquatic ecosystems, including fish species such as the Iberian barbel and trout. The watershed is also important for agriculture, particularly vineyards in the Douro Valley. Proper wastewater treatment helps maintain water quality in this ecologically and economically significant basin.
Frequently asked questions
The plant is located at ER 323, Tabuaço, Viseu, 5120-447, Portugal.
The plant serves a population equivalent of 3,600 people.
The plant provides secondary treatment, which removes organic matter and suspended solids.
Under the EU Urban Waste Water Treatment Directive (91/271/EEC), agglomerations with a population equivalent between 2,000 and 10,000 are required to have secondary treatment. Tabuaco meets this requirement.
The plant has a designed capacity of 3,605 cubic meters per day.
Nearby plants