Overview
ROWP SC Floricola Orsova is a secondary wastewater treatment plant serving Orșova, Romania, with a designed capacity of 11,000 m³/day and a population equivalent of 8,280.
ROWP SC Floricola Orsova is a municipal wastewater treatment plant located at 31 Strada Cernei in Orșova, Mehedinți County, Romania. The plant serves a population of approximately 8,280 and has a designed capacity of 11,000 m³/day, with an average discharge volume of 664.13 m³/day. The plant provides secondary treatment, which is the standard required under the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations between 2,000 and 10,000 population equivalent discharging into freshwater. As a Romanian facility, it operates under national transposition of this directive, with oversight from the Romanian Waters Authority. The treated effluent is discharged into the Danube River via the Cerna River, as Orșova is located near the Danube's Iron Gates reservoir. The Danube is a major European waterway that flows into the Black Sea, supporting diverse aquatic ecosystems and providing water for millions of people downstream.
Environmental context
The plant discharges into the Cerna River, a tributary of the Danube River near the Iron Gates reservoir. The Danube flows eastward through the Danube Delta before reaching the Black Sea. This stretch of the Danube supports important fish populations, including sturgeon species, and the delta is a critical wetland for migratory birds. Secondary treatment helps reduce organic pollution and protect these downstream ecosystems.
Frequently asked questions
The plant is located at 31 Strada Cernei in Orșova, Mehedinți County, Romania.
The plant serves a population equivalent of approximately 8,280 people.
The treated effluent is discharged into the Cerna River, which flows into the Danube River near the Iron Gates reservoir.
The plant provides secondary treatment, which is the standard required under the EU Urban Waste Water Treatment Directive for agglomerations of this size discharging into freshwater.
The plant has a designed capacity of 11,000 m³/day, with an average discharge volume of 664.13 m³/day.
Nearby plants