Risk: Medium Not Reported Advanced treatment Coastal (<10km)

Carral Abegondo Wastewater Treatment Plant, Carral, Galicia, Spain

Carral, Galicia, Spain

Overview

Carral Abegondo is an advanced wastewater treatment plant in Carral, Galicia, Spain, serving a population of 4,085. It discharges 528 m³/day of treated effluent and is located within 10 km of the coast.

Carral Abegondo is an advanced wastewater treatment plant located in Carral, in the province of A Coruña, Galicia, Spain. The plant serves a population of approximately 4,085 people and has a designed capacity of 4,000 m³/day, with a current discharge volume of 528 m³/day. As an advanced treatment facility, it provides a high level of pollutant removal, ensuring compliance with stringent environmental standards. The plant operates under Spain's implementation of the EU Urban Waste Water Treatment Directive (91/271/EEC), which requires appropriate treatment for agglomerations of this size. For small agglomerations like Carral, the directive mandates secondary treatment, but the plant's advanced treatment level exceeds these requirements, likely due to the sensitivity of the receiving environment. The treated effluent is discharged into local watercourses that flow toward the Atlantic coast, given the plant's proximity to the sea. The region's watershed supports diverse aquatic life and contributes to the ecological health of the Galician rias, which are important for fisheries and tourism. The plant's advanced treatment helps protect these downstream ecosystems from nutrient pollution and other contaminants.

Environmental context

The plant discharges into small streams that drain into the Atlantic Ocean via the Galician rias, a series of coastal inlets that support rich marine biodiversity. The region's watershed is ecologically sensitive, with habitats that sustain migratory fish species and shellfish populations. Advanced treatment at Carral Abegondo reduces nutrient loads, helping to prevent eutrophication in the coastal waters.

Frequently asked questions

The plant is located in Carral, in the province of A Coruña, Galicia, Spain, near the DP-2106 road in the parish of Vigo (San Vicente).

The plant serves a population of approximately 4,085 people.

The treated wastewater is discharged into local streams that flow toward the Atlantic coast, contributing to the Galician rias ecosystem.

The plant provides advanced treatment, which goes beyond the secondary treatment required by the EU Urban Waste Water Treatment Directive for agglomerations of this size.

The plant operates under Spain's transposition of the EU Urban Waste Water Treatment Directive (91/271/EEC), which sets standards for collection and treatment of wastewater in agglomerations.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search