Risk: Low Not Reported Advanced treatment

PERAL EL Wastewater Treatment Plant, El Peral, Castilla-La Mancha, Spain

El Peral, Castilla-La Mancha, Spain

Overview

PERAL EL is an advanced wastewater treatment plant serving El Peral, Castilla-La Mancha, Spain. It treats wastewater for approximately 1,644 residents with a discharge volume of 356.00 units.

PERAL EL is a wastewater treatment plant located in El Peral, a municipality in the province of Cuenca, within the autonomous community of Castilla-La Mancha, Spain. The plant serves a population of around 1,644 people, reflecting its role in managing domestic wastewater for this small inland community. The plant employs advanced treatment processes, which go beyond the secondary treatment required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for agglomerations of this size. This level of treatment ensures high-quality effluent, reducing pollutants such as nitrogen and phosphorus before discharge. The treated effluent is discharged into the local watershed, which ultimately drains into the Júcar River basin. The Júcar River flows eastward into the Mediterranean Sea, supporting diverse aquatic ecosystems along its course. The plant's advanced treatment helps protect downstream water quality and ecological health.

Environmental context

The plant discharges into the Júcar River basin, which flows through the province of Cuenca and eventually reaches the Mediterranean Sea. This watershed supports a variety of aquatic life and is important for regional water resources. The advanced treatment at PERAL EL helps minimize nutrient loading and protects the ecological integrity of the downstream environment.

Frequently asked questions

PERAL EL is located on CM-220 in El Peral, Cuenca, Castilla-La Mancha, Spain.

The plant serves approximately 1,644 residents in the municipality of El Peral.

The treated effluent is discharged into the local watershed, which flows into the Júcar River basin and eventually reaches the Mediterranean Sea.

PERAL EL uses advanced treatment, exceeding the secondary treatment standard required by the EU Urban Waste Water Treatment Directive for small agglomerations.

As a Spanish plant, PERAL EL operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which mandates appropriate treatment for agglomerations based on population size and receiving water sensitivity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search