Risk: Low Not Reported Advanced treatment

Hillerstorp ARV - Advanced Wastewater Treatment Plant in Törestorp, Sweden

Törestorp, Unknown, Sweden

Overview

Hillerstorp ARV is an advanced wastewater treatment plant in Törestorp, Sweden, serving approximately 2,338 people. It discharges treated water into the local watershed within the Gnosjö municipality.

Hillerstorp ARV is an advanced wastewater treatment facility located in Törestorp, within the Gnosjö municipality of Jönköping County, Sweden. The plant serves a population of around 2,338, classifying it as a small agglomeration under Swedish and EU regulations. The plant employs advanced treatment processes, which go beyond the secondary treatment standard required by the EU Urban Waste Water Treatment Directive (91/271/EEC) for smaller agglomerations. With a designed capacity of 3,000 cubic meters per day and a current discharge volume of 367 cubic meters per day, the facility operates well within its capacity, ensuring effective treatment. The treated effluent is discharged into the local water system, which ultimately drains into the Baltic Sea via the Nissan River basin. The plant's advanced treatment helps protect downstream aquatic ecosystems and supports Sweden's commitment to reducing nutrient loads in the Baltic Sea, a region sensitive to eutrophication.

Environmental context

The plant discharges into the local watershed within the Nissan River basin, which flows into the Kattegat strait and eventually the Baltic Sea. The Baltic Sea is a semi-enclosed sea highly sensitive to nutrient pollution, making advanced treatment crucial for reducing nitrogen and phosphorus loads. The surrounding area features mixed forest and agricultural land, contributing to diffuse pollution sources that the plant helps mitigate.

Frequently asked questions

Hillerstorp ARV is located in Törestorp, within the Gnosjö municipality of Jönköping County, Sweden.

The plant serves approximately 2,338 people, classifying it as a small agglomeration under EU wastewater directives.

Hillerstorp ARV provides advanced treatment, which includes nutrient removal beyond secondary treatment, helping to reduce environmental impact on receiving waters.

As a Swedish plant serving a small agglomeration, Hillerstorp ARV operates under the EU Urban Waste Water Treatment Directive (91/271/EEC), which requires secondary treatment as a minimum. The plant's advanced treatment exceeds these requirements, reflecting Sweden's national standards for sensitive areas.

The plant has a designed capacity of 3,000 cubic meters per day, with a current discharge volume of 367 cubic meters per day, indicating ample capacity for future growth.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search