Risk: Medium Not Reported Secondary treatment Coastal (<10km)

FRAMPTON STW - Secondary Wastewater Treatment Plant near Stroud, Gloucestershire

Stroud, England, United Kingdom

Overview

FRAMPTON STW is a secondary treatment plant serving 2,561 people in Stroud, England. It discharges 570.17 m³/day of treated wastewater near the River Severn estuary.

FRAMPTON STW is a municipal wastewater treatment plant located near Stroud in Gloucestershire, England. It serves a population of approximately 2,561 people and operates as part of the region's wastewater infrastructure. The plant is situated close to the River Severn, one of the longest rivers in the United Kingdom. The plant provides secondary treatment, which is the standard biological treatment required under the EU Urban Waste Water Treatment Directive (91/271/EEC) for inland discharges. With a designed capacity of 3,000 m³/day and an average discharge volume of 570.17 m³/day, the plant operates well within its capacity. As a small agglomeration (under 10,000 population equivalent), it meets the directive's requirements for secondary treatment. The treated effluent from FRAMPTON STW ultimately reaches the River Severn, which flows into the Severn Estuary and then the Bristol Channel. The estuary is a major ecological feature, supporting diverse bird populations and fish species. The plant's location within 10 km of the coast means its discharge contributes to the nutrient load in the estuary, a sensitive environment where nutrient management is important.

Environmental context

FRAMPTON STW discharges into the River Severn catchment, which drains into the Severn Estuary and the Bristol Channel. The estuary is a large, macrotidal system that supports important bird populations and fish spawning grounds. Nutrient inputs from wastewater treatment plants in the region are managed under the EU Urban Waste Water Treatment Directive and the UK's Water Framework Directive to protect water quality and ecological health.

Frequently asked questions

FRAMPTON STW is located near Stroud in Gloucestershire, England, close to the River Severn.

The plant serves a population of approximately 2,561 people.

The plant discharges treated effluent into the River Severn catchment, which flows into the Severn Estuary and Bristol Channel.

FRAMPTON STW provides secondary treatment, which is the standard biological treatment required for inland discharges under the EU Urban Waste Water Treatment Directive.

As a UK plant, FRAMPTON STW operates under the EU Urban Waste Water Treatment Directive (transposed into UK law) and the Water Framework Directive, which set standards for treatment and receiving water quality.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search