Risk: Low Not Reported Secondary treatment

OLDMELDRUM WWTP - Secondary Treatment Plant in Oldmeldrum, Scotland

Oldmeldrum, Alba / Scotland, United Kingdom

Overview

OLDMELDRUM WWTP is a secondary treatment plant serving 3,252 people in Oldmeldrum, Scotland. It discharges 724.01 m³/day of treated wastewater into local watercourses.

OLDMELDRUM WWTP is a municipal wastewater treatment facility located near Lochter Activity Centre in Oldmeldrum, Aberdeenshire, Scotland. The plant serves a population of approximately 3,252 people, classifying it as a small agglomeration under Scottish and UK regulations. The plant provides secondary treatment, which is the standard required by the Urban Waste Water Treatment (Scotland) Regulations 1994, transposing the EU Urban Waste Water Treatment Directive. With a designed capacity of 3,500 m³/day, the plant operates well within its capacity, treating an average daily flow of 724.01 m³/day. The treated effluent is discharged into local watercourses that drain into the River Don catchment, eventually reaching the North Sea. The plant plays a key role in protecting the water quality of the River Don and its tributaries, which support diverse aquatic life and are used for recreation and agriculture.

Environmental context

The plant discharges into the River Don catchment, which flows eastward through Aberdeenshire to the North Sea at Aberdeen. The River Don is a designated salmonid river supporting Atlantic salmon and brown trout populations. The secondary treatment provided by the plant helps maintain water quality standards in this ecologically sensitive river system, which is important for both biodiversity and local fisheries.

Frequently asked questions

OLDMELDRUM WWTP is located near the Lochter Activity Centre in Oldmeldrum, Aberdeenshire, Scotland, United Kingdom.

The plant serves a population of approximately 3,252 people, classifying it as a small agglomeration under Scottish wastewater regulations.

The plant discharges treated effluent into local watercourses within the River Don catchment, which ultimately flows into the North Sea.

OLDMELDRUM WWTP provides secondary treatment, meeting the standard required by the Urban Waste Water Treatment (Scotland) Regulations 1994 for small agglomerations.

The plant has a designed capacity of 3,500 m³/day, with an average daily flow of 724.01 m³/day, indicating it operates well below capacity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search