Risk: Low Not Reported Secondary treatment

RAF Lyneham STW - Secondary Wastewater Treatment Plant in Lyneham, Wiltshire

Lyneham, England, United Kingdom

Overview

RAF Lyneham STW is a secondary treatment plant serving 3,901 people in Lyneham, Wiltshire, England. It discharges 868.50 cubic meters of treated wastewater daily, with a designed capacity of 6,578 cubic meters.

RAF Lyneham STW is a wastewater treatment plant located on Eider Avenue in Lyneham, Wiltshire, England. It serves a population of 3,901 people and operates as part of the United Kingdom's wastewater infrastructure under the regulatory framework of the Urban Waste Water Treatment Directive (UWWTD) transposed into UK law. The plant provides secondary treatment, which is the standard biological treatment stage required for agglomerations of this size under the UWWTD. With a designed capacity of 6,578 cubic meters per day and an actual discharge volume of 868.50 cubic meters per day, the plant operates well below its capacity, indicating room for future growth or seasonal variations. The treated effluent is discharged into local watercourses that ultimately drain into the River Thames catchment, contributing to the freshwater resources of southern England. The plant's inland location, over 50 km from the coast, means its discharge primarily affects riverine ecosystems rather than marine environments.

Environmental context

The plant discharges into local streams that feed into the River Thames basin, one of the UK's most significant river systems. The Thames flows through London and into the North Sea, supporting diverse aquatic life and providing drinking water for millions. The secondary treatment process reduces organic pollutants and suspended solids, protecting downstream water quality in this ecologically sensitive catchment.

Frequently asked questions

RAF Lyneham STW is located on Eider Avenue in Lyneham, Wiltshire, England, United Kingdom.

The plant serves a population of 3,901 people in the Lyneham area.

The plant discharges treated effluent into local watercourses that are part of the River Thames catchment, ultimately flowing to the North Sea.

RAF Lyneham STW provides secondary treatment, which is the standard biological treatment required for agglomerations of this size under the UK's implementation of the EU Urban Waste Water Treatment Directive.

The plant has a designed capacity of 6,578 cubic meters per day, with an actual discharge volume of 868.50 cubic meters per day, indicating it operates well below its maximum capacity.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search