Risk: Low Projected Not Reported treatment

Bossier Parish SD 1 Wastewater Treatment Plant, Louisiana

Bossier Parish, Louisiana, United States

Overview

Bossier Parish SD 1 is a projected wastewater treatment plant in Louisiana, USA, serving approximately 32,000 people. It will operate under the US Clean Water Act's NPDES permitting program.

Bossier Parish SD 1 is a planned wastewater treatment facility located in Bossier Parish, Louisiana, United States. The plant is projected to serve a population of around 32,000, positioning it as a medium-sized municipal treatment facility within the region. As a projected facility, specific treatment processes and design capacity are not yet finalized. However, under the US Clean Water Act, plants of this scale are typically required to obtain National Pollutant Discharge Elimination System (NPDES) permits, which mandate secondary treatment as a minimum standard. The plant will likely incorporate biological treatment processes to meet effluent limits set by the Louisiana Department of Environmental Quality. The plant's discharge will ultimately flow into the Red River basin, which drains into the Mississippi River and then the Gulf of Mexico. This downstream pathway is ecologically significant, as the Mississippi River delivers nutrients and sediments that influence the Gulf's hypoxic zone. The plant's operation will be critical for protecting local water quality and reducing nutrient loading to this sensitive coastal ecosystem.

Environmental context

The plant will discharge into the Red River watershed, which flows into the Mississippi River and eventually the Gulf of Mexico. This drainage system supports diverse aquatic life and is a major migratory corridor for fish and birds. Nutrient loading from upstream sources contributes to seasonal hypoxia in the Gulf, making effective wastewater treatment essential for downstream ecosystem health.

Frequently asked questions

Bossier Parish SD 1 is located at 298 Cash Point Road in Bossier Parish, Louisiana, United States.

The plant is projected to serve approximately 32,000 people, classifying it as a medium-sized municipal wastewater treatment facility.

The plant will discharge treated effluent into the Red River basin, which flows into the Mississippi River and ultimately the Gulf of Mexico.

As a US facility, it will operate under the Clean Water Act and require an NPDES permit issued by the Louisiana Department of Environmental Quality, typically mandating secondary treatment.

Plants of this scale in the US commonly use activated sludge or similar biological treatment processes to meet secondary treatment standards, with possible nutrient removal in sensitive watersheds.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search