Risk: Low Not Reported Secondary treatment

Montgomery City Clear Creek WWTP - Secondary Treatment Plant in Montgomery City, Missouri

Montgomery City, Missouri, United States

Overview

Montgomery City Clear Creek WWTP is a secondary treatment plant serving 1,142 people in Montgomery City, Missouri. It discharges treated wastewater into local waterways under US EPA NPDES regulations.

Montgomery City Clear Creek WWTP is a municipal wastewater treatment facility located in Montgomery City, Missouri, serving a population of approximately 1,142 residents. The plant is situated in Montgomery County and operates as part of the city's essential water infrastructure. The plant provides secondary treatment, which is the standard level required by the US Clean Water Act for municipal wastewater. With a designed capacity of 1,135.62 cubic meters per day and an average discharge volume of 567.81 cubic meters per day, the facility operates at roughly half its capacity. As a US plant, it operates under National Pollutant Discharge Elimination System (NPDES) permits issued by the Missouri Department of Natural Resources, ensuring compliance with federal water quality standards. The treated effluent from the plant discharges into local streams that ultimately flow into the Missouri River watershed. The Missouri River is a major tributary of the Mississippi River, which drains into the Gulf of Mexico. The plant's operations help protect downstream aquatic ecosystems and maintain water quality in the region's surface waters.

Environmental context

The plant discharges into Clear Creek, a tributary of the Missouri River, which flows into the Mississippi River and eventually the Gulf of Mexico. The local watershed supports diverse aquatic life and provides habitat for fish and migratory birds. The plant's secondary treatment helps reduce nutrient loads and protect downstream water quality in this agriculturally intensive region.

Frequently asked questions

The plant is located in Montgomery City, Montgomery County, Missouri, United States, at coordinates 38.968000, -91.518000.

The plant serves a population of approximately 1,142 residents in Montgomery City and surrounding areas.

The plant discharges treated effluent into Clear Creek, which flows into the Missouri River watershed. The discharge is regulated under an NPDES permit to ensure compliance with water quality standards.

As a US municipal wastewater plant, it operates under the Clean Water Act and is permitted through the National Pollutant Discharge Elimination System (NPDES), administered by the Missouri Department of Natural Resources.

For small communities in Missouri, secondary treatment is standard, as required by the Clean Water Act. This level of treatment effectively removes organic matter and suspended solids to protect receiving water bodies.

Nearby plants

UtilityRadar
More
Press Esc to close · Advanced search