1 plants indexed.
Pienkowo secondary treatment plant serves Grabowo, Poland, discharging 149.29 m³/day. Located within 10 km of the Baltic Sea coast, it operates under EU Urban Waste Water Treatment Directive standards.
UtilityRadar indexes 1 wastewater treatment plant in Grabowo, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Pienkowo has the highest designed capacity at 2,000 m3/day.