Wastewater plants in Poland

1,667 plants indexed. Showing 955 matching current filters.

955 plants matching filters

Barwice

Górki, województwo zachodniopomorskie

Barwice wastewater treatment plant in Górki, Poland, serves 5,145 people with secondary treatment. It discharges 733.60 m³/day and has a designed capacity of 6,811.00 m³/day.

Secondary 5,145 Low

Oczyszczalnia sciekow w miejscowosci Boze

Boża Wólka, województwo warmińsko-mazurskie

Oczyszczalnia sciekow w miejscowosci Boze is a secondary treatment plant serving 142 people in Boża Wólka, Warmian-Masurian Voivodeship, Poland. It discharges 20.25 m³/day of treated wastewater.

Secondary 142 Low

Stare Juchy

Stare Juchy, województwo warmińsko-mazurskie

Stare Juchy wastewater treatment plant serves the town of Stare Juchy in warmińsko-mazurskie, Poland. It provides secondary treatment for a population of 1,045, discharging 149 m³/day.

Secondary 1,045 Low

Dzwierzuty

Dźwierzuty, województwo warmińsko-mazurskie

Dzwierzuty wastewater treatment plant serves the town of Dźwierzuty in Warmian-Masurian Voivodeship, Poland. It provides secondary treatment for a population of 1,299.

Secondary 1,299 Low

Jonkowo

Jonkowo, województwo warmińsko-mazurskie

Jonkowo wastewater treatment plant serves the town of Jonkowo in Warmian-Masurian Voivodeship, Poland. It provides secondary treatment for a population of 3,640 with a designed capacity of 670 m³/day.

Secondary 3,640 Low

Pozezdrze

Pozezdrze, województwo warmińsko-mazurskie

Pozezdrze wastewater treatment plant in warmińsko-mazurskie, Poland, serves 1,521 people with secondary treatment. It discharges 216.87 m³/day and has a designed capacity of 3,798 m³/day.

Secondary 1,521 Low

SEPOPOL

Podlechy, województwo warmińsko-mazurskie

SEPOPOL secondary wastewater treatment plant serves Podlechy, Poland, with a population equivalent of 1,465. It discharges 208.89 cubic meters of treated effluent daily, operating under EU Urban Waste Water Treatment Directive standards.

Secondary 1,465 Low

Stawiguda

Bartąg, województwo warmińsko-mazurskie

Stawiguda wastewater treatment plant in Bartąg, Poland, serves 4,597 people with secondary treatment. It discharges 655.46 m³/day and has a designed capacity of 6,000 m³/day.

Secondary 4,597 Low

Bisztynek Kolonia

Warmiany, województwo warmińsko-mazurskie

Bisztynek Kolonia is a secondary wastewater treatment plant in Warmiany, Poland, serving approximately 3,400 people. It operates under the EU Urban Waste Water Treatment Directive with a designed capacity of 3,540 m³/day.

Secondary 3,399 Low

Wydminy

Włosty, województwo warmińsko-mazurskie

Wydminy wastewater treatment plant in Włosty, Poland, serves 4,035 people with secondary treatment. The facility discharges 575.33 m³/day and has a designed capacity of 5,336 m³/day.

Secondary 4,035 Low

Wielbark

Wielbark, województwo warmińsko-mazurskie

Wielbark wastewater treatment plant serves the town of Wielbark in warmińsko-mazurskie, Poland. It provides secondary treatment for a population of 1,373, with a designed capacity of 2,500 m³/day.

Secondary 1,373 Low

Prostki

Prostki, województwo warmińsko-mazurskie

Prostki wastewater treatment plant serves the town of Prostki in Warmian-Masurian Voivodeship, Poland. It provides secondary treatment for a population of 1,887 with a designed capacity of 4,875 m³/day.

Secondary 1,887 Low

RYN

Ryn, województwo warmińsko-mazurskie

Ryn wastewater treatment plant in województwo warmińsko-mazurskie, Poland, serves 1,888 people with secondary treatment. It has a designed capacity of 10,000 m³/day and discharges 269.20 m³/day.

Secondary 1,888 Low

Uzdowo

Żabiny, województwo warmińsko-mazurskie

Uzdowo wastewater treatment plant serves Żabiny in warmińsko-mazurskie, Poland. It provides secondary treatment for a population of 1,336 with a designed capacity of 4,600 m³/day.

Secondary 1,336 Low

Pieniezno

Pieniężno, województwo warmińsko-mazurskie

Pieniezno wastewater treatment plant serves the town of Pieniężno in warmińsko-mazurskie, Poland. It provides secondary treatment for a population of 3,287 and has a designed capacity of 6,000 m³/day.

Secondary 3,287 Low

Piecki

Piecki, województwo warmińsko-mazurskie

Piecki wastewater treatment plant serves the town of Piecki in Warmian-Masurian Voivodeship, Poland. It provides secondary treatment for a population of 2,698 with a designed capacity of 11,000 m³/day.

Secondary 2,698 Low

Biskupiec

Fitowo, województwo warmińsko-mazurskie

Biskupiec wastewater treatment plant in Fitowo, Poland, serves 4,236 people with secondary treatment. It discharges 603.99 m³/day and has a designed capacity of 8,333 m³/day.

Secondary 4,236 Low

Oczyszczalnia sciekow w Milakowie

Miłakowo, województwo warmińsko-mazurskie

Oczyszczalnia sciekow w Milakowie is a secondary treatment plant serving Miłakowo, Poland. It discharges treated wastewater into the local watershed, supporting environmental protection in the warmińsko-mazurskie region.

Secondary 3,450 Low

Rybno

Rybno, województwo warmińsko-mazurskie

Rybno wastewater treatment plant in warmińsko-mazurskie, Poland, serves 1,847 people with secondary treatment. It discharges 263.35 m³/day and has a designed capacity of 7,700 m³/day.

Secondary 1,847 Low

Dabrowno

Dąbrówno, województwo warmińsko-mazurskie

Dabrowno wastewater treatment plant serves 222 people in Dąbrówno, Poland, with secondary treatment. It discharges 31.65 m³/day and has a designed capacity of 13,900 m³/day.

Secondary 222 Low

Frequently asked

How many wastewater treatment plants are in Poland?

UtilityRadar indexes 1667 wastewater treatment plants in Poland, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Poland?

Among the indexed plants, Dabrowno has the highest designed capacity at 13,900 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector