5 plants indexed.
Aldeia Gavinha wastewater treatment plant in Alenquer, Portugal, serves 1,700 people with secondary treatment. The plant is now closed, having discharged treated effluent into the local watershed.
Atouguia_Abrigada is a secondary wastewater treatment plant serving 2,100 people in Alenquer, Portugal. It discharges treated effluent into the local watershed, contributing to the Tagus River basin.
Espicandeira wastewater treatment plant serves Alenquer, Portugal, with secondary treatment for a population of 4,620. It discharges 770.30 cubic meters of treated wastewater daily, with a designed capacity of 5,600 cubic meters.
Alenquer wastewater treatment plant serves approximately 9,000 people in Alenquer, Portugal. It operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.
Carregado wastewater treatment plant serves Alenquer, Portugal, with a designed capacity of 1.00 and a population equivalent of 11,000. It operates under EU Urban Waste Water Treatment Directive standards.