3 plants indexed.
Santo Estevao wastewater treatment plant in Benavente, Portugal serves 1,400 people with secondary treatment. The plant is now closed but historically discharged treated wastewater into the local watershed.
Quinta do Papelao is a secondary wastewater treatment plant serving 2,800 people in Benavente, Portugal. It discharges 466.85 cubic meters of treated effluent daily, with a designed capacity of 3,961 cubic meters.
Cerrado das Aguas is an advanced wastewater treatment plant serving Benavente, Portugal. It treats wastewater from a population of 5,500 with a designed capacity of 8,000 m³/day and a discharge volume of 917.02 m³/day.
UtilityRadar indexes 3 wastewater treatment plants in Benavente, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Cerrado das Aguas has the highest designed capacity at 8,000 m3/day.