8 plants indexed.
Ameal wastewater treatment plant serves 2,300 people in Coimbra, Portugal. It operates with advanced treatment and a designed capacity of 4,000 m³/day, discharging 383.48 m³/day.
Ceira wastewater treatment plant serves the Ceira parish in Coimbra, Portugal. It provides secondary treatment for a population of 2,900 with a designed capacity of 3,000 m³/day.
S Silvestre is a secondary wastewater treatment plant serving 4,600 people in Coimbra, Portugal. With a designed capacity of 4,800 m³/day, it discharges 766.96 m³/day of treated effluent.
Torres do Mondego is an advanced wastewater treatment plant serving 1,489 people in Coimbra, Portugal. It discharges 248.26 cubic meters of treated wastewater daily, with a designed capacity of 3,800 cubic meters.
Vendas de Ceira is a secondary treatment plant serving 2,500 people in Coimbra, Portugal. It discharges treated wastewater into the local watershed, supporting the Mondego River basin.
Choupal wastewater treatment plant serves Coimbra, Portugal, with a population equivalent of 170,000. It operates under the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this scale.
Rib de Frades wastewater treatment plant serves Coimbra, Portugal, with a designed capacity of 1.00 and a population served of 33,361. It operates under the EU Urban Waste Water Treatment Directive.
Taveiro is a closed secondary wastewater treatment plant in Coimbra, Portugal. It had a designed capacity of 3,000 m³/day and served the local area before decommissioning.