3 plants indexed.
ROWP Primaria Barbatesti is a secondary treatment plant serving 287 people in Bărbătești, Vâlcea, Romania. It discharges treated wastewater into the local watershed, contributing to the Olt River basin.
ROWP Primaria Carta is a secondary treatment plant serving 768 people in Câineni, Vâlcea, Romania. It discharges 150.93 m³/day of treated wastewater, with a designed capacity of 1,200 m³/day.
ROWP SC APAVIL SA Vaideeni is a secondary treatment plant serving 158 people in Vâlcea, Romania. It discharges 19.95 m³/day of treated wastewater into local water bodies.
UtilityRadar indexes 3 wastewater treatment plants in Vâlcea, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, ROWP SC APAVIL SA Vaideeni has the highest designed capacity at 4,000 m3/day.