550 plants indexed. Showing 6 matching current filters.
ROWP SC Aquaserv SA Tulcea Centrul Operational Babadag is a secondary treatment plant serving 4,781 people in Babadag, Romania. It discharges 612.51 m³/day of treated wastewater and is located within 10 km of the Black Sea coast.
ROWP Primaria Baia is a secondary wastewater treatment plant serving Baia, Romania. It treats an average daily flow of 46.51 m³/day with a designed capacity of 2,506 m³/day.
ROWP Primaria Ceamurlia de Jos is a secondary treatment plant serving 281 people in Ceamurlia de Jos, Tulcea, Romania. It discharges 8.81 m³/day of treated wastewater near the Black Sea coast.
ROWP Primaria Jurilovca is a secondary treatment plant serving 1,181 people in Jurilovca, Tulcea, Romania. It discharges treated wastewater near the Black Sea coast.
ROWP Cogealac is a secondary wastewater treatment plant serving 616 people in Constanța, Romania. It discharges treated effluent near the Black Sea coast.
ROWP RAJA Ovidiu is a secondary treatment plant serving 12,144 people in Ovidiu, Romania. Located within 10 km of the Black Sea coast, it operates under the EU Urban Waste Water Treatment Directive.
UtilityRadar indexes 550 wastewater treatment plants in Unknown, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, ROWP SC Aquaserv SA Tulcea Centrul Operational Babadag has the highest designed capacity at 10,800 m3/day.