324 plants indexed. Showing 11 matching current filters.
ALMACHAR EL BORGE is an advanced wastewater treatment plant in Almáchar, Andalucía, Spain, serving 4,000 people. It discharges treated water near the coast, supporting local environmental health.
Cabo de Gata wastewater treatment plant serves 4,092 people in Almería, Andalucía, Spain, with advanced treatment. It discharges 741.66 m³/day and is located within 10 km of the coast.
CASARES wastewater treatment plant in Casares, Andalucía, Spain, serves a population of 3,618 with secondary treatment. It discharges 655.75 m³/day of treated wastewater near the Costa del Sol coast.
Castellar de la Frontera wastewater treatment plant in Andalusia, Spain, serves 4,519 people with secondary treatment. It discharges 819.06 m³/day and is located near the coast.
Cómpeta wastewater treatment plant in Andalucía, Spain serves 2,534 people with advanced treatment. It discharges 459.28 m³/day and is located near the Mediterranean coast.
DALIAS wastewater treatment plant in Dalías, Andalucía, Spain, serves 4,400 people with secondary treatment. It discharges 797.49 m³/day and is located within 10 km of the coast.
GUADIARO wastewater treatment plant in San Roque, Andalucía, Spain, serves 4,000 people with secondary treatment. It discharges 724.99 m³/day and is located within 10 km of the coast.
Puente Esuri wastewater treatment plant serves the Costa Esuri area of Ayamonte, Andalucía, Spain. It provides secondary treatment for a population of 4,025 and discharges 729.52 m³/day.
ROTA wastewater treatment plant in Rota, Andalucía, Spain, serves approximately 50,177 people with secondary treatment. The plant has a designed capacity of 70,100 m³/day and discharges 97.06 m³/day of treated wastewater near the coast.
SAN JOSE secondary treatment plant serves 5,000 people in Níjar, Almería, Spain. It discharges 906.24 m³/day of treated wastewater within 10 km of the Mediterranean coast.
Villablanca San Silvestre is a secondary wastewater treatment plant in Villablanca, Huelva, Andalusia, Spain. It serves approximately 4,729 people with a designed capacity of 5,000 m³/day.