3 plants indexed.
EDAR de Marazul is a secondary wastewater treatment plant serving 2,042 people in Adeje, Tenerife, Canary Islands, Spain. It discharges 370.11 m³/day and is located within 10 km of the coast.
EDAR de Adeje Arona is a major wastewater treatment plant serving 238,333 people in Adeje, Tenerife, Canary Islands, Spain. It operates under the EU Urban Waste Water Treatment Directive, ensuring coastal water quality.
ETAR de Sueño Azul is a wastewater treatment plant serving 9,750 people in Adeje, Tenerife, Canary Islands, Spain. It is located within 50 km of the coast, discharging into the Atlantic Ocean.
UtilityRadar indexes 3 wastewater treatment plants in Adeje, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, EDAR de Marazul has the highest designed capacity at 3,708 m3/day.