4 plants indexed.
TENOYA is a secondary wastewater treatment plant in Las Palmas de Gran Canaria, Canarias, Spain, serving 7,086 people with a designed capacity of 6,800 m³/day and a discharge volume of 878.82 m³/day.
Barranco Seco II serves Las Palmas de Gran Canaria, Spain, with a designed capacity of 1.00 unit. The plant supports a population of 328,319 and is located within 50 km of the coast in the Canary Islands.
EL FONDILLO is a closed secondary treatment plant in Las Palmas de Gran Canaria, Canarias, Spain. It was designed for a capacity of 6,000 m³/day and is located within 10 km of the coast.
TAMARACEITE wastewater treatment plant serves Las Palmas de Gran Canaria, Canarias, Spain. Located near the coast, it is part of the region's municipal infrastructure.