Wastewater plants in Santa Cruz de Tenerife

6 plants indexed.

6 plants matching filters

SAN JOSE

Santa Cruz de Tenerife, Canarias

SAN JOSE wastewater treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, is a closed secondary treatment facility serving 1,365 people. It discharged 247.40 m³/day before closure.

Secondary 1,365 Medium

ETAR de AcorAn

Santa Cruz de Tenerife, Canarias

ETAR de Acorán is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving about 4,400 people. It discharges treated wastewater near the coast, operating under Spanish and EU regulations.

Primary 4,402 Medium

ETAR de San Andres

Santa Cruz de Tenerife, Canarias

ETAR de San Andres is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving 4,618 people. It discharges 837 m³/day of treated wastewater near the coast.

Primary 4,618 Medium

EDAR de Buenos Aires

Santa Cruz de Tenerife, Canarias

EDAR de Buenos Aires is a wastewater treatment plant serving 231,732 people in Santa Cruz de Tenerife, Canary Islands, Spain. Located near the coast, it operates under EU regulations for large agglomerations.

Not Reported 231,732 Medium

ETAR de ANaza

Santa Cruz de Tenerife, Canarias

ETAR de Añaza is a municipal wastewater treatment plant serving 6,603 people in Santa Cruz de Tenerife, Canary Islands, Spain. It operates under Spain's implementation of the EU Urban Waste Water Treatment Directive.

Not Reported 6,603 Medium

ETAR de Los Llanos

Santa Cruz de Tenerife, Canarias

ETAR de Los Llanos is a major wastewater treatment plant serving Santa Cruz de Tenerife, Canary Islands, Spain. It handles a population equivalent of 231,732 and is located within 50 km of the coast.

Not Reported 231,732 Medium

Frequently asked

How many wastewater treatment plants are in Santa Cruz de Tenerife?

UtilityRadar indexes 6 wastewater treatment plants in Santa Cruz de Tenerife, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Santa Cruz de Tenerife?

Among the indexed plants, ETAR de AcorAn has the highest designed capacity at 10,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector