2 plants indexed.
ARA Ruenenberg Nord is an advanced wastewater treatment plant in Rünenberg, Basel-Landschaft, Switzerland, serving a small population of 188. It discharges 85.34 m³/day and operates under Swiss water protection regulations.
ARA Ruenenberg Sued is a secondary treatment plant in Rünenberg, Basel-Landschaft, Switzerland, serving 135 people with a designed capacity of 317 m³/day.
UtilityRadar indexes 2 wastewater treatment plants in Rünenberg, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, ARA RUENENBERG NORD has the highest designed capacity at 440 m3/day.