1 plants indexed.
STEP LA SCIE is a secondary treatment plant serving Bourrignon, Switzerland. It treats wastewater for 121 people with a designed capacity of 283 m³/day.
UtilityRadar indexes 1 wastewater treatment plant in Bourrignon, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, STEP LA SCIE has the highest designed capacity at 283 m3/day.