Wastewater plants in Jura

21 plants indexed. Showing 18 matching current filters.

18 plants matching filters

STEP ST URSANNE

Clos du Doubs, Jura

STEP ST URSANNE is a secondary treatment plant in Clos du Doubs, Switzerland, serving 1,576 people. It discharges 715.38 m³/day of treated wastewater into the local watershed.

Secondary 1,576 Low

STEP MONTIGNEZ

Basse-Allaine, Jura

STEP MONTIGNEZ is a secondary wastewater treatment plant in Basse-Allaine, Jura, Switzerland, serving 242 people with a design capacity of 567 m³/day and a discharge volume of 109.85 m³/day.

Secondary 242 Low

STEP SECO

Damphreux-Lugnez, Jura

STEP SECO is a secondary wastewater treatment plant serving Damphreux-Lugnez, Jura, Switzerland. Designed for 1,700 m³/day, it treats wastewater from about 1,017 people and discharges into local waterways.

Secondary 1,017 Low

STEP FAHY

Fahy, Jura

STEP FAHY is a secondary treatment plant serving Fahy, Jura, Switzerland. It treats wastewater for 242 residents with a designed capacity of 567 m³/day.

Secondary 242 Low

STEP BURE

Bure, Jura

STEP BURE is a secondary wastewater treatment plant in Bure, Jura, Switzerland, serving approximately 1,800 people. It has a designed capacity of 3,000 m³/day and discharges 815.24 m³/day of treated effluent.

Secondary 1,796 Low

STEP SOUBEY

Soubey, Jura

STEP SOUBEY is a secondary treatment plant serving 107 people in Soubey, Jura, Switzerland. It discharges 48.57 m³/day of treated wastewater, with a designed capacity of 250 m³/day.

Secondary 107 Low

STEP ST BRAIS

Saint-Brais, Jura

STEP ST BRAIS is a secondary treatment plant serving 135 people in Saint-Brais, Jura, Switzerland. It discharges 61.28 m³/day of treated wastewater into the local watershed.

Secondary 135 Low

STEP LE NOIRMONT

Le Noirmont, Jura

STEP LE NOIRMONT is a secondary treatment plant serving Le Noirmont, Jura, Switzerland. It treats wastewater for a population of 1,496 with a designed capacity of 2,500 m³/day.

Secondary 1,496 Low

STEP MONTFAUCON

Montfaucon, Jura

STEP MONTFAUCON is a secondary treatment plant serving 818 people in Montfaucon, Jura, Switzerland. It discharges 371.31 m³/day of treated wastewater, with a designed capacity of 1367.00 m³/day.

Secondary 818 Low

STEP LAJOUX

Lajoux (JU), Jura

STEP LAJOUX is a secondary treatment plant serving 406 people in Lajoux, Jura, Switzerland. It discharges 184.29 m³/day of treated wastewater into the local watershed.

Secondary 406 Low

STEP LES BREULEUX

Les Breuleux, Jura

STEP LES BREULEUX is a secondary wastewater treatment plant in Les Breuleux, Jura, Switzerland, serving a population of 1,716. It discharges treated effluent into the local watershed within the Franches-Montagnes region.

Secondary 1,716 Low

STEP LA BROCHE

Les Bois, Jura

STEP LA BROCHE is a secondary wastewater treatment plant in Les Bois, Jura, Switzerland, serving 977 people with a designed capacity of 1,633 m³/day.

Secondary 977 Low

STEP SAULCY

Saulcy, Jura

STEP SAULCY is a secondary treatment plant serving Saulcy, Jura, Switzerland, with a designed capacity of 633 m³/day and serving 271 people.

Secondary 271 Low

STEP MOVELIER

Movelier, Jura

STEP MOVELIER is a secondary wastewater treatment plant in Movelier, Jura, Switzerland, serving 320 people with a designed capacity of 750 m³/day.

Secondary 320 Low

STEP MONTSEVELIER

Val Terbi, Jura

STEP MONTSEVELIER is a secondary treatment plant in Val Terbi, Jura, Switzerland, serving 278 people with a designed capacity of 650 m³/day. It discharges 126.19 m³/day of treated wastewater into the local watershed.

Secondary 278 Low

STEP LA ROCHE

Haute-Sorne, Jura

STEP LA ROCHE is a secondary treatment plant in Haute-Sorne, Jura, Switzerland, serving 164 people. It discharges 74.44 m³/day of treated wastewater and has a designed capacity of 383.00 m³/day.

Secondary 164 Low

KLARANLAGE EDERSWILER

Ederswiler, Jura

KLARANLAGE EDERSWILER is a secondary treatment plant in Ederswiler, Jura, Switzerland, serving 135 people with a designed capacity of 317 m³/day and a discharge volume of 61.28 m³/day.

Secondary 135 Low

STEP LA SCIE

Bourrignon, Jura

STEP LA SCIE is a secondary treatment plant serving Bourrignon, Switzerland. It treats wastewater for 121 people with a designed capacity of 283 m³/day.

Secondary 121 Low

Frequently asked

How many wastewater treatment plants are in Jura?

UtilityRadar indexes 21 wastewater treatment plants in Jura, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Jura?

Among the indexed plants, STEP BURE has the highest designed capacity at 3,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector