120 plants indexed. Showing 18 matching current filters.
ABERGAVENNY STW is a secondary wastewater treatment plant in Glangrwyney, Wales, serving approximately 3,182 people. It discharges 708.42 cubic meters of treated effluent daily, with a designed capacity of 3,319 cubic meters.
ADPAR WWTW serves Newcastle Emlyn, Wales, treating wastewater for approximately 1,883 people. The plant operates at secondary treatment level under UK regulations, discharging into local watercourses.
BALA WWTW STW is a secondary treatment plant serving Llangywer, Gwynedd, Wales. It discharges treated wastewater into the local catchment, ultimately draining to the Dee Estuary and Irish Sea.
Builth Wells STW STW is a secondary treatment plant in Llanelwedd, Wales, serving approximately 3,034 people. It discharges treated wastewater into the local catchment, contributing to the protection of the River Wye and downstream environments.
Corwen WWTW STW is a secondary treatment plant serving approximately 1,760 people in Corwen, Wales. It discharges treated wastewater into the local water environment under UK regulations.
DREFACH_VELI STW is a secondary treatment plant in Waungilwen, Carmarthenshire, Wales, serving approximately 2,445 people. It discharges 544.34 m³/day of treated wastewater, with a designed capacity of 2,519 m³/day.
FFAIRFACH WWTW is a secondary treatment plant serving Llandeilo, Wales, UK. It treats wastewater for approximately 2,895 people with a designed capacity of 3,472 m³/day and an average discharge volume of 644.53 m³/day.
Lampeter STW STW is a secondary wastewater treatment plant serving approximately 3,165 people in Lampeter, Ceredigion, Wales. It discharges 704.64 cubic meters of treated effluent daily.
Llandovery Wastewater Treatment STW is a secondary treatment plant serving the town of Llandovery in Carmarthenshire, Wales. It discharges treated effluent into local waterways, supporting the region's water quality.
Llandysul WWTW is a secondary treatment plant serving 2,012 people in Pont-Tyweli, Wales. It discharges 447.94 m³/day of treated wastewater into the local catchment.
Llangollen STW is a secondary treatment plant serving 3,436 people in Llangollen, Wales. It discharges treated wastewater into the River Dee basin, supporting local water quality.
LLANIDLOES STW is a secondary treatment plant serving approximately 3,280 people in Llanidloes, Wales. It discharges 730.24 m³/day of treated wastewater, with a designed capacity of 3,500 m³/day.
Llanrwst STW is a secondary treatment plant serving approximately 3,823 people in Conwy, Wales. It discharges treated wastewater into the local water environment, operating under UK regulations.
Llanybydder WWTW is a secondary treatment plant in Ceredigion, Wales, serving around 1,991 people. It discharges treated wastewater into local watercourses within the Teifi River catchment.
PANT PLAS CERRIG STW FE is a secondary treatment plant in Llandysilio, Wales, serving a population of 2,192. It discharges 488.02 cubic meters of treated wastewater daily.
PRESTEIGNE STW CLATTERBROOM STW is a secondary treatment plant serving Presteigne, Wales, UK. It treats wastewater for a population of 2,262 with a designed capacity of 2,589 m³/day and a discharge volume of 503.6 m³/day.
Rhayader STW is a secondary treatment plant serving approximately 2,105 people in Rhayader, Powys, Wales. It discharges treated wastewater into the local river system within the Wye catchment.
TALGARTH STW BRONLLYS ROAD is a secondary treatment plant serving Bronllys, Powys, Wales. It treats wastewater for approximately 2,911 people with a designed capacity of 3,081 m³/day.