Wastewater plants in England

1,483 plants indexed. Showing 227 matching current filters.

227 plants matching filters

EASTBOURNE STW

Unknown, England

Eastbourne STW is a wastewater treatment plant serving approximately 116,000 people in Eastbourne, England. It operates under the UK's implementation of the EU Urban Waste Water Treatment Directive.

Not Reported 116,351 Medium

EASTCHURCH STW

Swale, England

EASTCHURCH STW serves the Swale area of Kent, England, treating wastewater for approximately 8,068 people. The plant is located near the coast and discharges into the local watershed.

Not Reported 8,068 Medium

EASTLEIGH STW

Eastleigh, England

EASTLEIGH STW serves approximately 97,000 people in Eastleigh, Hampshire, England. The plant discharges treated wastewater into the local water environment, contributing to the protection of the River Itchen and Southampton Water.

Not Reported 97,233 Medium

EIGN STW OUTFALL WORKS ROAD HFD STW

Bullinghope, England

EIGN STW Outfall Works Road HFD STW is a wastewater treatment plant serving Bullinghope, England, UK. It handles a population equivalent of 135,931 and has a designed capacity of 1.00 (units unspecified).

Not Reported 135,931 Medium

ELLESMERE PORT STW

Thornton le Moors, England

ELLESMERE PORT STW serves approximately 105,000 people in Thornton le Moors, England. The plant operates under the UK's wastewater regulatory framework, discharging treated effluent into the local catchment.

Not Reported 105,093 Medium

ERNESETTLE AND SALTASH STW

Plymouth, England

Ernesettle and Saltash STW serves approximately 58,400 people in Plymouth, England. The plant operates under the UK's urban wastewater treatment regulations, discharging treated effluent into the local water environment.

Not Reported 58,407 Medium

ESHER FARM ROAD ESHER SURREY STW

Elmbridge, England

ESHER FARM ROAD ESHER SURREY STW serves approximately 114,000 people in Elmbridge, England, as part of the UK's wastewater infrastructure under the Urban Waste Water Treatment Regulations.

Not Reported 114,000 Medium

EXETER STW

Exeter, England

EXETER STW serves approximately 153,000 people in Exeter, England, as part of the region's municipal wastewater infrastructure. The plant operates under the EU Urban Waste Water Treatment Directive.

Not Reported 152,749 Medium

EXMOUTH STW

East Devon, England

EXMOUTH STW serves approximately 52,000 people in East Devon, England, discharging treated wastewater into the English Channel via a coastal outfall.

Not Reported 52,035 Medium

FALMOUTH STW

Unknown, England

Falmouth STW serves approximately 42,867 people in Black Rock, England. The plant discharges treated wastewater into the local water environment, operating under UK regulations derived from the EU Urban Waste Water Treatment Directive.

Not Reported 42,867 Medium

FAREHAM AND GOSPORT HAMBLE HEDGE END PEEL COMMON STW

Unknown, England

Fareham and Gosport Hamble Hedge End Peel Common STW serves approximately 243,000 people in southern England. The plant discharges treated wastewater near Browndown Point, contributing to the protection of local water quality.

Not Reported 242,999 Medium

FAVERSHAM STW

Swale, England

FAVERSHAM STW serves approximately 29,436 people in Swale, Kent, England. The plant operates under the UK's implementation of the EU Urban Waste Water Treatment Directive, which mandates secondary treatment for agglomerations of this size.

Not Reported 29,436 Medium

FAWLEY CALSHOT BLACKFIELD STW

New Forest, England

FAWLEY CALSHOT BLACKFIELD STW serves approximately 14,895 people in the New Forest area of Hampshire, England. The plant discharges treated wastewater into the local environment near the Solent.

Not Reported 14,895 Medium

FELIXSTOWE STW

East Suffolk, England

Felixstowe STW serves approximately 30,764 people in East Suffolk, England. The plant discharges treated wastewater into the North Sea via the River Orwell estuary.

Not Reported 30,764 Medium

Fleetwood and Blackpool Fleetwood Marsh STW

Unknown, England

Fleetwood and Blackpool Fleetwood Marsh STW serves approximately 286,000 people in England, United Kingdom. The plant is located near the coast and operates under the EU Urban Waste Water Treatment Directive.

Not Reported 285,896 Medium

FORMBY STW

Sefton, England

FORMBY STW serves Sefton, England, treating wastewater for approximately 24,700 people. The plant operates under UK regulations aligned with the EU Urban Waste Water Treatment Directive.

Not Reported 24,700 Medium

GRANGE OVER SANDS STW

Westmorland and Furness, England

GRANGE OVER SANDS STW serves 9,700 people in Westmorland and Furness, England. The plant operates under the UK's wastewater regulatory framework, discharging treated effluent to local watercourses.

Not Reported 9,700 Medium

GRAVESEND STW

Gravesham, England

Gravesend STW serves Gravesham, Kent, England, treating wastewater for approximately 59,313 people. The plant operates under the UK's implementation of the EU Urban Waste Water Treatment Directive.

Not Reported 59,313 Medium

GREAT YARMOUTH CAISTER STW

Great Yarmouth, England

Great Yarmouth Caister STW serves over 108,000 people in Norfolk, England. The plant discharges treated wastewater into the North Sea via the Yare estuary, supporting local water quality.

Not Reported 108,084 Medium

GRIMSBY STW

Grimsby, England

GRIMSBY STW serves approximately 132,000 people in Grimsby, England. The plant is located near the Humber Estuary and operates under the UK's wastewater regulatory framework.

Not Reported 132,133 Medium
UtilityRadar
More
Press Esc to close · Advanced search