Wastewater plants in Massachusetts

119 plants indexed. Showing 15 matching current filters.

15 plants matching filters

Acton Wastewater Collection System

Marlborough, Massachusetts

Acton Wastewater Collection System in Marlborough, Massachusetts provides secondary treatment for a small population of 1,971. The plant discharges 757.08 cubic meters per day, operating under US EPA and state regulations.

Secondary 1,971 Low

Ashfield Dept of Public Works

Ashfield, Massachusetts

Ashfield Dept of Public Works is a secondary wastewater treatment plant serving 406 residents in Ashfield, Massachusetts. It discharges 113.56 cubic meters of treated effluent daily.

Secondary 406 Low

Charlton Water and Sewer Commission

Charlton, Massachusetts

Charlton Water and Sewer Commission is a secondary treatment plant serving 1,343 people in Charlton, Massachusetts. It discharges 378.54 m³/day of treated wastewater into local waterways.

Secondary 1,343 Low

Douglas Wastewater Treatment Fac

Douglas, Massachusetts

Douglas Wastewater Treatment Fac serves 1,085 people in Douglas, Massachusetts, with secondary treatment. The plant discharges 227.13 thousand cubic meters annually and has a design capacity of 454.25 thousand cubic meters.

Secondary 1,085 Low

Erving Village Wastewater System

Erving, Massachusetts

Erving Village Wastewater System serves 545 residents in Erving, Massachusetts, with secondary treatment. The plant discharges 492.10 volume units into local waters, operating under US EPA NPDES regulations.

Secondary 545 Low

Erving WWTF No 1

Hardwick, Massachusetts

Erving WWTF No 1 is a secondary treatment plant serving 237 people in Hardwick, Massachusetts. It discharges 37.85 million gallons per year and has a designed capacity of 151.42 million gallons.

Secondary 237 Low

Hatfield Dept of Public Works

Hatfield, Massachusetts

Hatfield Dept of Public Works is a secondary wastewater treatment plant serving 1,491 people in Hatfield, Massachusetts. The facility discharges treated effluent into the Connecticut River watershed.

Secondary 1,491 Low

Huntington Dept of Public Works

Huntington, Massachusetts

Huntington Dept of Public Works is a secondary treatment plant serving 794 people in Huntington, Massachusetts. It discharges 264.98 thousand cubic meters of treated wastewater annually.

Secondary 794 Low

Monroe Dept of Public Works

Monroe, Massachusetts

Monroe Dept of Public Works is a secondary treatment plant serving 59 residents in Monroe, Massachusetts. It discharges 30.28 thousand cubic meters per year into local waterways.

Secondary 59 Low

Northfield Dept of Public Works

Northfield, Massachusetts

Northfield Dept of Public Works is a secondary wastewater treatment plant serving 1,870 residents in Northfield, Massachusetts. It discharges 832.79 thousand gallons per day into the local watershed.

Secondary 1,870 Low

Rochdale Water Pollution Control

Oxford, Massachusetts

Rochdale Water Pollution Control in Oxford, Massachusetts, is a secondary treatment plant serving 1,193 people. It discharges 681.37 million gallons per year into the local watershed.

Secondary 1,193 Low

Royalston Dept of Public Works

Royalston, Massachusetts

Royalston Dept of Public Works is a secondary wastewater treatment plant serving 186 residents in Royalston, Massachusetts. It discharges treated effluent into local waterways within the Millers River watershed.

Secondary 186 Low

Russell Dept of Public Works

Russell, Massachusetts

Russell Dept of Public Works is a secondary treatment plant serving 865 people in Russell, Massachusetts. It discharges 227.13 megaliters annually and has a designed capacity of 378.54 megaliters.

Secondary 865 Low

Shirley Dept of Public Works

Ayer, Massachusetts

Shirley Dept of Public Works is a secondary wastewater treatment plant in Ayer, Massachusetts, serving 525 people. It discharges 378.54 cubic meters of treated effluent daily.

Secondary 525 Low

Sunderland Collection System

Sunderland, Massachusetts

Sunderland Collection System is a secondary wastewater treatment plant serving 2,615 people in Sunderland, Massachusetts. It discharges 794.94 megaliters annually and has a designed capacity of 1,892.70 megaliters.

Secondary 2,615 Low
UtilityRadar
More
Press Esc to close · Advanced search