2 plants indexed.
Batavia WWTP and Sewer System is a secondary treatment plant serving 1,617 people in Batavia, Ohio. It discharges 757.08 cubic meters of treated wastewater daily, with a designed capacity of 908.50 cubic meters.
Clermont Co Middle East Fork WWTP serves Batavia, Ohio, treating wastewater for approximately 26,500 residents. The plant operates under the US Clean Water Act framework, discharging into the local watershed.
UtilityRadar indexes 2 wastewater treatment plants in Batavia, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Batavia WWTP and Sewer System has the highest designed capacity at 909 m3/day.