817 plants indexed. Showing 11 matching current filters.
Troy Township Wastewater District in Ashland County, Ohio, provides secondary treatment for a small population of 316. The plant discharges 113.56 megaliters annually and operates under US EPA NPDES regulations.
Wayne WWTP and Sewer System in Wood County, Ohio, serves 842 people with secondary treatment. The plant discharges 302.83 million gallons per year and operates under US EPA NPDES regulations.
Wakeman WWTP and Sewer System is a secondary treatment plant serving 951 people in Wakeman, Ohio. It discharges 374.76 thousand cubic meters of treated wastewater annually.
Metamora WWTP and Sewer System is a secondary treatment plant serving 598 residents in Metamora, Ohio. It discharges 435.32 thousand cubic meters of treated wastewater annually.
Luckey WWTP and Sewer System serves Wood County, Ohio, providing secondary treatment for a population of 998. The plant discharges 454.25 volume units and has a designed capacity of 454.25.
Geauga Co Surrey Downs WWTP is a secondary treatment plant in Chardon, Ohio, serving 120 people. It discharges 37.85 cubic meters of treated wastewater daily, located within 10 km of the Lake Erie coast.
Bradner WWTP and Sewer System is a secondary treatment plant serving approximately 1,171 people in Bradner, Ohio. It discharges treated wastewater into local waterways within the Lake Erie basin.
Savannah WWTP and Sewer System serves 372 people in Ashland County, Ohio, with secondary treatment. The plant discharges 132.49 megaliters annually and has a designed capacity of 189.27 megaliters.
Republic WWTP and Sewers in Seneca County, Ohio, serves 650 people with secondary treatment. The plant discharges 227.13 million gallons per year and has a designed capacity of 283.91 million gallons.
Bloomville WWTP and Sewers is a secondary treatment plant serving approximately 1,045 residents in Bloomville, Ohio. It discharges 363.40 megaliters per year into local waterways within the Lake Erie basin.
New Washington WWTP and Sewers serves Crawford County, Ohio, providing secondary treatment for a small population of 987. The plant discharges 378.54 cubic meters per day and has a designed capacity of 567.81 cubic meters per day.
UtilityRadar indexes 817 wastewater treatment plants in Ohio, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, Wakeman WWTP and Sewer System has the highest designed capacity at 909 m3/day.