239 plants indexed. Showing 29 matching current filters.
ETE TRAIRI is a wastewater treatment plant serving Trairi, Ceará, Brazil. It serves a population of 5,674 and has a designed capacity of 1.00 (unit unspecified).
ETE PECEM is a wastewater treatment plant in São Gonçalo do Amarante, Ceará, Brazil, serving approximately 6,878 people. It is located within 50 km of the coast, near the Pecém industrial port complex.
ETE Lagoinha Paraipaba Lagoinha Distrito is a wastewater treatment plant in Paraipaba, Ceará, Brazil, serving approximately 5,954 people. It has a designed capacity of 1.00 cubic meters per second.
ETE Paraipaba is a wastewater treatment plant serving the town of Paraipaba in Ceará, Brazil. It treats municipal wastewater for a population of approximately 5,954 people.
ETE Paracuru is a municipal wastewater treatment plant serving Paracuru, Ceará, Brazil. It is located within 50 km of the coast and serves a population of approximately 8,016.
ETE Maracanaú 2 is a municipal wastewater treatment plant serving Maracanaú, Ceará, Brazil. It serves a population of 30,154 and is located within 50 km of the coast.
ETE Maracanaú 1 is a wastewater treatment plant in Fortaleza, Ceará, Brazil, serving approximately 30,154 people. It is located within 50 km of the coast and has a designed capacity of 1.00.
ETE Distrito Industrial Maracanau serves 30,154 people in Fortaleza, Ceará, Brazil. The plant operates under Brazil's national wastewater regulations, discharging into the local watershed.
ETE Itarema is a wastewater treatment plant serving 7,022 people in Itarema, Ceará, Brazil. It is located within 50 km of the coast in the Northeast Region.
EPC Fortaleza is a major wastewater treatment plant serving over 1.3 million people in Fortaleza, Ceará, Brazil. It is located near the coast and operates under Brazil's national water quality regulations.
ETE Jose Walter is a wastewater treatment plant in Fortaleza, Ceara, Brazil, serving approximately 19,410 people. It is located near the coast in the Praia do Futuro II neighborhood.
ETE Sao Cristovao Fortaleza is a municipal wastewater treatment plant in Fortaleza, Ceara, Brazil, serving approximately 11,731 people. The plant is located within 50 km of the coast and discharges into the local watershed.
ETE Palmeiras Fortaleza is a wastewater treatment plant serving approximately 21,670 people in Fortaleza, Ceará, Brazil. Located near Praia do Futuro, it plays a key role in managing municipal wastewater in the coastal region.
ETE Tancredo Neves Fortaleza serves approximately 13,000 people in Fortaleza, Ceará, Brazil. The plant is located within 50 km of the coast and discharges into the local watershed.
ETE Conjunto Ceará is a municipal wastewater treatment plant serving 36,181 people in Fortaleza, Ceará, Brazil. It operates within Brazil's national water quality framework, discharging into the local watershed.
ETE JUREMA is a wastewater treatment plant in Caucaia, Ceará, Brazil, serving approximately 13,942 people. It is located within 50 km of the coast, discharging into the local watershed.
ETE MARECHAL RONDON IV is a municipal wastewater treatment plant in Caucaia, Ceará, Brazil, serving approximately 13,942 people. It is located within 50 km of the coast, near the metropolitan region of Fortaleza.
ETE Boa Esperanca Caucaia is a wastewater treatment plant serving Fortaleza, Ceará, Brazil. It treats wastewater from approximately 13,942 people and has a designed capacity of 1.00 (unit unspecified).
ETE SAO PAULO CAUCAIA is a wastewater treatment plant serving approximately 13,942 people in Fortaleza, Ceará, Brazil. The plant operates within Brazil's national regulatory framework for wastewater management.
ETE Tabapua is a municipal wastewater treatment plant in Caucaia, Ceara, Brazil, serving approximately 13,942 people. It is located within 50 km of the coast, discharging into the local watershed.
UtilityRadar indexes 239 wastewater treatment plants in Ceará, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CAGECE. UtilityRadar's records show 20 plants linked to this operator.
Among the indexed plants, ETE TRAIRI has the highest designed capacity at 1 m3/day.