783 plants indexed.
ETE Barbosa SP is a secondary-level wastewater treatment plant serving Barbosa, São Paulo, Brazil. It treats wastewater for approximately 5,613 residents with a discharge volume of 475.99 (unit unspecified).
ETE BAREQUECABA is an advanced wastewater treatment plant in São Sebastião, São Paulo, Brazil, serving 448 people with a discharge volume of 500.69 m³/day. It is located within 10 km of the coast, treating wastewater to protect coastal waters.
ETE Barra do Turvo is a secondary treatment plant serving 2,284 people in Barra do Turvo, São Paulo, Brazil. It discharges 267.07 cubic meters of treated wastewater daily.
ETE Barueri is a secondary treatment plant serving Barueri, São Paulo, Brazil. It treats wastewater for a population of 7,364 with a discharge volume of 762.91 (unit unspecified).
ETE BASSI is a secondary-level wastewater treatment plant in Tatuí, São Paulo, Brazil. It serves approximately 6,656 people and discharges about 991 m³/day of treated effluent.
ETE BATISTA BOTELHO is a secondary treatment plant serving 255 people in Óleo, São Paulo, Brazil. It discharges 38.70 m³/day of treated wastewater into local water bodies.
ETE BATOVI is a secondary treatment plant in Rio Claro, São Paulo, Brazil, serving 853 people. It discharges 172.80 cubic meters of treated wastewater daily.
ETE Bento de Abreu is a secondary treatment plant serving 2,510 people in Bento de Abreu, São Paulo, Brazil. It discharges treated wastewater into local water bodies within the Paraná River basin.
ETE BOFETE is a secondary wastewater treatment plant in Bofete, São Paulo, Brazil, serving approximately 5,870 people with a discharge volume of 756.82 units.
ETE Bom Sucesso de Itararé is a secondary treatment plant serving 1,976 people in Bom Sucesso de Itararé, São Paulo, Brazil. It discharges treated wastewater into local water bodies.
ETE BORA is a secondary wastewater treatment plant serving Borá, São Paulo, Brazil. It treats wastewater from a small population of 772 and discharges 96.33 units of treated effluent.
ETE Boraceia is a secondary treatment plant serving Boraceia, Sao Paulo, Brazil. It treats wastewater from approximately 3,843 residents with a discharge volume of 560.49 units.
ETE BORDON I is a secondary wastewater treatment plant in Sumaré, São Paulo, Brazil. It serves approximately 3,404 people and discharges 864 cubic meters of treated effluent daily.
ETE Bosque das Palmeiras is a secondary treatment plant serving 1,872 people in Campinas, São Paulo, Brazil. It discharges 258.34 thousand m³/year of treated wastewater.
ETE BRAUNA is a secondary treatment plant serving Braúna, São Paulo, Brazil. It treats wastewater for approximately 4,593 residents, discharging 566.61 cubic meters daily.
ETE BREJO ALEGRE is a secondary treatment plant serving Brejo Alegre, São Paulo, Brazil. It treats wastewater from a population of 1,839 and discharges 296.66 units of treated effluent.
ETE Buritizal is a secondary treatment plant serving 3,266 people in Buritizal, São Paulo, Brazil. It discharges 468.95 thousand cubic meters of treated wastewater annually into local water bodies.
ETE Cabrália Paulista is a secondary wastewater treatment plant serving 3,840 people in Cabrália Paulista, São Paulo, Brazil. It discharges approximately 534.81 cubic meters of treated effluent daily.
ETE Cabreuva is a secondary treatment plant serving Cabreúva, São Paulo, Brazil. It discharges approximately 557.77 m³/day of treated wastewater into local water bodies.
ETE CAIABU is a secondary wastewater treatment plant serving Caiabu, São Paulo, Brazil. It treats municipal wastewater for a population of 2,698, discharging 289.62 cubic meters of treated effluent.