2,820 plants indexed.
ETE Campos Sales is a secondary wastewater treatment plant serving 5,064 people in Campos Sales, Ceará, Brazil. It discharges 424.22 m³/day of treated effluent into local water bodies.
ETE Compacta Bairro de Fatima is a secondary treatment plant in Boa Viagem, Ceara, Brazil, serving 266 people with a discharge volume of 22.97 units.
ETE BELA CRUZ is a secondary wastewater treatment plant serving Bela Cruz, Ceará, Brazil. It discharges approximately 595 m³/day of treated effluent, supporting local sanitation infrastructure.
ETE Morro Branco is a secondary treatment plant serving Fortim, Ceará, Brazil. It discharges approximately 544 m³/day of treated wastewater and is located within 10 km of the coast.
ETE CHORO is a secondary-level wastewater treatment plant in Beberibe, Ceará, Brazil, serving 698 people. It discharges treated effluent near the Atlantic coast.
ETE SITIO LUCAS is a secondary wastewater treatment plant in Beberibe, Ceará, Brazil, serving 2,315 people. It discharges 206.40 cubic meters of treated effluent and is located within 10 km of the coast.
ETE PROURB 2 is a secondary treatment plant serving 212 people in Baturité, Ceará, Brazil. It discharges 31.10 m³/day of treated wastewater into the local watershed.
ETE PROURB 1 is a secondary treatment plant serving 159 people in Baturité, Ceará, Brazil. It discharges 23.33 cubic meters of treated wastewater daily, protecting local water resources.
ETE SAO FRANCISCO is a secondary wastewater treatment plant in Baturité, Ceará, Brazil, serving a small population of 697. It discharges 102.48 cubic meters of treated wastewater, supporting local water quality.
ETE Bitupita is a secondary wastewater treatment plant serving 378 people in Barroquinha, Ceará, Brazil. It discharges 26.96 m³/day of treated effluent near the Atlantic coast.
ETE Barroquinha is a secondary-level wastewater treatment plant serving Barroquinha, Ceará, Brazil. It treats municipal wastewater for a population of 2,418 and discharges 172.45 cubic meters of treated effluent.
ETE BARRO is a secondary wastewater treatment plant serving Barro, Ceará, Brazil. It treats municipal wastewater for approximately 2,900 residents with a discharge volume of 177.12 units.
ETE Barreira is a secondary wastewater treatment plant in Barreira, Ceará, Brazil, serving approximately 3,195 people with a discharge volume of 480 m³/day.
ETE Barbalha is a secondary treatment plant serving 21,814 people in Barbalha, Ceará, Brazil. It discharges 665.28 m³/day of treated wastewater into local water bodies.
ETE Aurora is a secondary treatment plant serving Aurora, Ceará, Brazil. It treats wastewater from approximately 3,500 residents with a discharge volume of 220.32 m³/day.
ETE Aratuba is a secondary-level wastewater treatment plant serving the municipality of Aratuba in Ceará, Brazil. It treats wastewater for a population of approximately 1,527 and discharges 432.00 cubic meters per day.
ETE Amontada is a secondary treatment plant serving 319 people in Amontada, Ceará, Brazil. It discharges 28.40 m³/day of treated wastewater into the local environment.
ETE Altaneira is a secondary wastewater treatment plant serving Altaneira, Ceará, Brazil. It treats approximately 1,358 people and discharges 87.26 m³/day of treated effluent.
ETE ALCANTARAS is a secondary wastewater treatment plant in Alcântaras, Ceará, Brazil, serving approximately 2,757 people. It discharges 214.27 cubic meters of treated effluent daily.
ETE MASSAPE ACARAU is a secondary treatment plant serving Acaraú, Ceará, Brazil. It discharges treated wastewater near the coast, supporting local sanitation for approximately 7,272 residents.
UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is CAGECE. UtilityRadar's records show 20 plants linked to this operator.