2,820 plants indexed. Showing 1,603 matching current filters.
ETE AREIAL is a secondary wastewater treatment plant serving Porto Amazonas, Paraná, Brazil. It discharges approximately 589 m³/day of treated effluent, supporting local sanitation infrastructure.
ETE Samambaia Paranagua is a secondary treatment plant serving 4,062 people in Paranaguá, Paraná, Brazil. It discharges 864.00 m³/day of treated wastewater near the Atlantic coast.
ETE Barcelona Mandirituba is a secondary wastewater treatment plant serving Mandirituba, Paraná, Brazil. It discharges approximately 62.21 cubic meters of treated effluent daily.
ETE BUQUEIRINHO is a secondary treatment plant in Itaperuçu, Paraná, Brazil, serving approximately 3,377 people. It discharges treated wastewater into local water bodies, supporting downstream ecosystems.
ETE GUARAQUECABA is a secondary treatment plant serving 2,500 people in Guaraqueçaba, Paraná, Brazil. It discharges 633.31 m³/day of treated wastewater near the coast.
ETE Santa Candida is a secondary treatment plant serving 446 people in Colombo, Paraná, Brazil. It discharges 77.08 m³/day of treated wastewater into local water bodies.
ETE CONTENDA is a secondary wastewater treatment plant in Araucária, Paraná, Brazil, serving approximately 6,444 people. It discharges treated effluent into local water bodies within the Iguaçu River basin.
ETE Marambaia is a secondary treatment plant serving Colombo, Paraná, Brazil. It treats wastewater for approximately 63,833 people with a discharge volume of 730.64 units.
ETE Colombo Sede is a secondary wastewater treatment plant serving Colombo, Paraná, Brazil. It treats municipal wastewater for approximately 35,855 people with a discharge volume of 410.40 (unit unspecified).
ETE VILA ELIANE is a secondary wastewater treatment plant in Cerro Azul, Paraná, Brazil. It serves a small population of 102 and discharges 12.96 cubic meters of treated wastewater.
ETE POLO I is a secondary treatment plant serving Carambeí, Paraná, Brazil. It treats wastewater for approximately 3,950 people with a discharge volume of 400.90 (unit unspecified).
ETE Itaqui Campo Largo is a secondary treatment plant serving 5,310 people in Campo Largo, Paraná, Brazil. It discharges 505.51 cubic meters of treated wastewater daily.
ETE Engenho Campina Grande do Sul is a secondary treatment plant serving 27,307 people in Campina Grande do Sul, Paraná, Brazil. It discharges 345.60 cubic meters of treated wastewater daily.
ETE TAPERA is a secondary treatment plant serving Bocaiúva do Sul, Paraná, Brazil. It treats wastewater for approximately 5,520 residents with a discharge volume of 477.81 cubic meters.
ETE Balsa Nova is a secondary wastewater treatment plant serving 1,471 people in Lapa, Paraná, Brazil. It discharges 286.85 m³/day of treated effluent into local waterways.
ETE AGUDOS DO SUL is a secondary treatment plant serving Agudos do Sul, Paraná, Brazil. It treats wastewater for a population of 913 with a discharge volume of 172.80 m³/day.
ETE Varzelandia Sede is a secondary wastewater treatment plant serving 1,660 people in Varzelândia, Minas Gerais, Brazil. It discharges 144.29 m³/day of treated effluent into local water bodies.
ETE VARZEA DA PALMA is a secondary treatment plant serving Várzea da Palma, Minas Gerais, Brazil. It treats wastewater for approximately 6,066 residents.
ETE WALITA is a secondary wastewater treatment plant in Varginha, Minas Gerais, Brazil, serving 814 people. It discharges 103.68 m³/day of treated effluent into local water bodies.
ETE SEDE VARGEM BONITA is a secondary treatment plant serving 1,170 people in Vargem Bonita, Minas Gerais, Brazil. It discharges approximately 221.93 cubic meters of treated wastewater daily.
UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.
Among the plants on this page, the most-referenced operator is SANEPAR. UtilityRadar's records show 16 plants linked to this operator.