Wastewater plants in Brazil

2,820 plants indexed. Showing 1,603 matching current filters.

1,603 plants matching filters

ETE AREIAL

Porto Amazonas, Paraná

ETE AREIAL is a secondary wastewater treatment plant serving Porto Amazonas, Paraná, Brazil. It discharges approximately 589 m³/day of treated effluent, supporting local sanitation infrastructure.

Secondary 2,126 Low

ETE SAMAMBAIA PARANAGUA

Paranaguá, Paraná

ETE Samambaia Paranagua is a secondary treatment plant serving 4,062 people in Paranaguá, Paraná, Brazil. It discharges 864.00 m³/day of treated wastewater near the Atlantic coast.

Secondary 4,062 Medium

ETE BARCELONA MANDIRITUBA

Mandirituba, Paraná

ETE Barcelona Mandirituba is a secondary wastewater treatment plant serving Mandirituba, Paraná, Brazil. It discharges approximately 62.21 cubic meters of treated effluent daily.

Secondary 350 Low

ETE BUQUEIRINHO

Itaperuçu, Paraná

ETE BUQUEIRINHO is a secondary treatment plant in Itaperuçu, Paraná, Brazil, serving approximately 3,377 people. It discharges treated wastewater into local water bodies, supporting downstream ecosystems.

Secondary 3,377 Low

ETE GUARAQUECABA

Guaraqueçaba, Paraná

ETE GUARAQUECABA is a secondary treatment plant serving 2,500 people in Guaraqueçaba, Paraná, Brazil. It discharges 633.31 m³/day of treated wastewater near the coast.

Secondary 2,500 Medium

ETE SANTA CANDIDA

Colombo, Paraná

ETE Santa Candida is a secondary treatment plant serving 446 people in Colombo, Paraná, Brazil. It discharges 77.08 m³/day of treated wastewater into local water bodies.

Secondary 446 Low

ETE CONTENDA

Araucária, Paraná

ETE CONTENDA is a secondary wastewater treatment plant in Araucária, Paraná, Brazil, serving approximately 6,444 people. It discharges treated effluent into local water bodies within the Iguaçu River basin.

Secondary 6,444 Low

ETE MARAMBAIA

Colombo, Paraná

ETE Marambaia is a secondary treatment plant serving Colombo, Paraná, Brazil. It treats wastewater for approximately 63,833 people with a discharge volume of 730.64 units.

Secondary 63,833 Low

ETE COLOMBO SEDE

Colombo, Paraná

ETE Colombo Sede is a secondary wastewater treatment plant serving Colombo, Paraná, Brazil. It treats municipal wastewater for approximately 35,855 people with a discharge volume of 410.40 (unit unspecified).

Secondary 35,855 Low

ETE VILA ELIANE

Cerro Azul, Paraná

ETE VILA ELIANE is a secondary wastewater treatment plant in Cerro Azul, Paraná, Brazil. It serves a small population of 102 and discharges 12.96 cubic meters of treated wastewater.

Secondary 102 Low

ETE POLO I

Carambeí, Paraná

ETE POLO I is a secondary treatment plant serving Carambeí, Paraná, Brazil. It treats wastewater for approximately 3,950 people with a discharge volume of 400.90 (unit unspecified).

Secondary 3,950 Low

ETE ITAQUI CAMPO LARGO

Campo Largo, Paraná

ETE Itaqui Campo Largo is a secondary treatment plant serving 5,310 people in Campo Largo, Paraná, Brazil. It discharges 505.51 cubic meters of treated wastewater daily.

Secondary 5,310 Low

ETE ENGENHO CAMPINA GRANDE DO SUL

Campina Grande do Sul, Paraná

ETE Engenho Campina Grande do Sul is a secondary treatment plant serving 27,307 people in Campina Grande do Sul, Paraná, Brazil. It discharges 345.60 cubic meters of treated wastewater daily.

Secondary 27,307 Low

ETE TAPERA

Bocaiúva do Sul, Paraná

ETE TAPERA is a secondary treatment plant serving Bocaiúva do Sul, Paraná, Brazil. It treats wastewater for approximately 5,520 residents with a discharge volume of 477.81 cubic meters.

Secondary 5,520 Low

ETE BALSA NOVA

Lapa, Paraná

ETE Balsa Nova is a secondary wastewater treatment plant serving 1,471 people in Lapa, Paraná, Brazil. It discharges 286.85 m³/day of treated effluent into local waterways.

Secondary 1,471 Low

ETE AGUDOS DO SUL

Agudos do Sul, Paraná

ETE AGUDOS DO SUL is a secondary treatment plant serving Agudos do Sul, Paraná, Brazil. It treats wastewater for a population of 913 with a discharge volume of 172.80 m³/day.

Secondary 913 Low

ETE VARZELANDIA_SEDE

Varzelândia, Minas Gerais

ETE Varzelandia Sede is a secondary wastewater treatment plant serving 1,660 people in Varzelândia, Minas Gerais, Brazil. It discharges 144.29 m³/day of treated effluent into local water bodies.

Secondary 1,660 Low

ETE VARZEA DA PALMA

Várzea da Palma, Minas Gerais

ETE VARZEA DA PALMA is a secondary treatment plant serving Várzea da Palma, Minas Gerais, Brazil. It treats wastewater for approximately 6,066 residents.

Secondary 6,066 Low

ETE WALITA

Varginha, Minas Gerais

ETE WALITA is a secondary wastewater treatment plant in Varginha, Minas Gerais, Brazil, serving 814 people. It discharges 103.68 m³/day of treated effluent into local water bodies.

Secondary 814 Low

ETE SEDE VARGEM BONITA

Vargem Bonita, Minas Gerais

ETE SEDE VARGEM BONITA is a secondary treatment plant serving 1,170 people in Vargem Bonita, Minas Gerais, Brazil. It discharges approximately 221.93 cubic meters of treated wastewater daily.

Secondary 1,170 Low

Frequently asked

How many wastewater treatment plants are in Brazil?

UtilityRadar indexes 2820 wastewater treatment plants in Brazil, with treatment level, capacity, operator and discharge data on each record.

Who operates wastewater treatment in Brazil?

Among the plants on this page, the most-referenced operator is SANEPAR. UtilityRadar's records show 16 plants linked to this operator.

UtilityRadar
More
Press Esc to close · Browse by sector