3,895 plants indexed worldwide.
Plants located within 10 km of a coastline. Discharge impact on marine environments is a primary concern for these facilities.
The etangs Aeres Mt Carmel wastewater treatment plant serves the community of Mont-Carmel, Québec, Canada. It provides secondary treatment and discharges treated effluent near the St. Lawrence River.
Etangs eaux usees St Methode is a secondary wastewater treatment plant serving 245 people in Saint-Félicien, Québec, Canada. It discharges treated effluent near the Saguenay-Lac-Saint-Jean region.
The etangs Municipalite de Berthier sur Mer wastewater treatment plant serves Berthier-sur-Mer, Quebec, Canada. It provides secondary treatment for a population of 1,708 and discharges 767.00 cubic meters of treated wastewater daily.
etangs SCM is a secondary wastewater treatment plant in Alma, Quebec, Canada, serving approximately 1,486 people. It discharges 667.00 cubic meters of treated wastewater daily.
ETAR de Acorán is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving about 4,400 people. It discharges treated wastewater near the coast, operating under Spanish and EU regulations.
ETAR de Caletillas is a primary treatment plant serving 2,442 people in Candelaria, Canary Islands, Spain. It discharges 442.61 m³/day of treated wastewater near the coast of Tenerife.
ETAR de Los Silos is a primary treatment plant serving 3,248 people in Los Silos, Canary Islands, Spain. It discharges 588.69 m³/day of treated wastewater near the coast.
ETAR de Punta Blanca is a primary treatment plant in Guía de Isora, Canary Islands, Spain. Serving about 1,988 people, it discharges treated wastewater near the coast.
ETAR de San Andres is a primary treatment plant in Santa Cruz de Tenerife, Canary Islands, Spain, serving 4,618 people. It discharges 837 m³/day of treated wastewater near the coast.
ETAR de Tabaiba is a primary treatment plant in El Rosario, Tenerife, Canary Islands, serving 4,611 people with a designed capacity of 10,000 m³/day and discharging 835.73 m³/day.
ETAR del Polígono Industrial de Granadilla is a primary treatment plant in Arico, Canarias, Spain, serving a population of 2,931. It discharges 531.24 m³/day of treated wastewater near the coast.
ETAR Los Abrigos is a primary wastewater treatment plant in Granadilla de Abona, Tenerife, Canary Islands, serving approximately 4,087 people with a design capacity of 10,000 m³/day.
ETE 24 DE MARCO is a secondary treatment plant in Fortaleza, Ceará, Brazil, serving 209 people. It discharges 30.07 m³/day of treated wastewater near the coast.
ETE 31 DE MARCO is a secondary wastewater treatment plant in Fortaleza, Ceará, Brazil, serving 881 people. It discharges 126.65 units of treated effluent and is located within 10 km of the coast.
ETE 8 DE SETEMBRO is a secondary treatment plant in Fortaleza, Ceará, Brazil, serving 222 people. It discharges 31.97 units of treated wastewater near the coast.
ETE ABARE is a secondary wastewater treatment plant serving Abaré, Bahia, Brazil. It discharges treated effluent near the coast, supporting local sanitation for approximately 8,595 residents.
ETE ABENCOADA POR DEUS is a secondary treatment plant serving 1,724 people in Recife, Pernambuco, Brazil. It discharges 205.00 cubic meters of treated wastewater daily.
ETE ACARAPE is a secondary wastewater treatment plant in Fortaleza, Ceará, Brazil, serving about 5,900 people. It discharges treated effluent near the Atlantic coast.
ETE ADOLFO is a secondary wastewater treatment plant in Adolfo, São Paulo, Brazil, serving approximately 3,153 people. It discharges treated effluent into local waterways near the coast.
ETE Aguas Claras Salvador is a secondary treatment plant in Salvador, Bahia, Brazil. It serves a small population of 845 and discharges 91.34 units of treated wastewater, located near the coast.