Within 50 km of coast coastal proximity wastewater plants

12,962 plants indexed worldwide.

Plants located within 50 km of a coastline.

12,962 plants

CONTRADA_NACA

Ispica, Sicilia, Italy

Contrada Naca is a secondary wastewater treatment plant in Ispica, Sicily, serving about 17,780 people. It discharges treated effluent near the coast, operating under Italy's implementation of the EU Urban Waste Water Treatment Directive.

Secondary 17,780

CONTRADA_COZZO_RIPA

Giarratana, Sicilia, Italy

Contrada Cozzo Ripa is a secondary wastewater treatment plant in Giarratana, Sicily, Italy, serving approximately 4,621 people with a designed capacity of 5,200 m³/day.

Secondary 4,621

IMPIANTO_FRAZIONE_PEDALINO

Comiso, Sicilia, Italy

Impianto Frazione Pedalino is a secondary treatment plant serving 3,000 people in Comiso, Sicily, Italy. It discharges 593.89 m³/day of treated wastewater into the local watershed.

Secondary 3,000

IMPIANTO_CONTRADA_BALATELLE

Comiso, Sicilia, Italy

Impianto Contrada Balatelle is a secondary wastewater treatment plant serving Comiso, Sicily, Italy. It treats wastewater from approximately 30,400 residents with a design capacity of 32,000 m³/day.

Secondary 30,400

IMPIANTO_C_DA_MORANA

Villaggio Gulfi, Sicilia, Italy

Impianto C Da Morana is a secondary wastewater treatment plant serving Villaggio Gulfi, Sicily, Italy. It treats wastewater for approximately 7,000 residents with a designed capacity of 7,000 cubic meters per day.

Secondary 7,000

IMPIANTO_C_DA_CANALE

Acate, Sicilia, Italy

Impianto C Da Canale is a secondary wastewater treatment plant serving Acate, Sicily, Italy. It has a designed capacity of 7,000 m³/day and serves approximately 8,000 people.

Secondary 8,000

IMPIANTO_C_DA_IMPERIO

Lapide Pasteria, Sicilia, Italy

IMPIANTO C DA IMPERIO is a secondary wastewater treatment plant serving Lapide Pasteria, Sicily, Italy. It treats wastewater from a population of 3,082 and discharges 610.13 cubic meters per day.

Secondary 3,082

IMPIANTO_C_DA_ROCCARO

Maletto, Sicilia, Italy

Impianto C da Roccaro is a secondary wastewater treatment plant serving Maletto, Sicily, Italy. It treats wastewater from approximately 4,027 residents with a designed capacity of 6,000 m³/day.

Secondary 4,027

IMPIANTO_VALLONE_BIANCO_C_DA_CHIAPPARA_DEL_TERRITORIO_DI_SUTERA

Milena, Sicilia, Italy

Impianto Vallone Bianco is a secondary treatment plant in Milena, Sicily, serving 420 people with a designed capacity of 500 m³/day. It discharges 83.15 m³/day of treated wastewater into the local watershed.

Secondary 420

IMPIANTO_C_DA_INDIRIZZO

Piazza Armerina, Sicilia, Italy

IMPIANTO C DA INDIRIZZO is an advanced wastewater treatment plant serving Piazza Armerina, Sicily, Italy. It treats wastewater for approximately 20,700 people with a designed capacity of 22,300 m³/day.

Advanced 20,700

IMPIANTO_C_DA_FAVARA

Pietraperzia, Sicilia, Italy

Impianto C da Favara is a secondary wastewater treatment plant serving Pietraperzia, Sicily, Italy. It treats wastewater for approximately 3,500 residents with a designed capacity of 4,000 cubic meters per day.

Secondary 3,500

IMPIANTO_DI_DEPURAZIONE_DI_GAGGI

Castiglione di Sicilia, Sicilia, Italy

Impianto di Depurazione di Gaggi is a primary treatment plant serving 3,500 people in Castiglione di Sicilia, Sicily, Italy. It discharges 692.88 m³/day of treated wastewater near the coast.

Primary 3,500

IMPIANTO_C_DA_ROCCHE

Pietraperzia, Sicilia, Italy

IMPIANTO C DA ROCCHE in Pietraperzia, Sicily, Italy, is a closed primary treatment plant that served 5,000 people. It had a designed capacity of 8,000 m³/day and discharged 989.82 m³/day.

Primary 5,000

IMPIANTO_C_DA_BIRRUSO

Capizzi, Sicilia, Italy

IMPIANTO C DA BIRRUSO is a secondary wastewater treatment plant serving Capizzi, Sicily, Italy. It treats wastewater for about 3,610 people with a designed capacity of 3,800 m³/day.

Secondary 3,610

IMPIANTO_C_DA_MINIERE_MARINARA

Centuripe, Sicilia, Italy

Impianto C da Miniere Marinara is a secondary wastewater treatment plant serving Centuripe, Sicily, Italy. It treats wastewater for approximately 5,775 people with a designed capacity of 10,000 cubic meters per day.

Secondary 5,775

FRANCAVILLA_ANGITOLA_FRA_GIUSEPPE

Francavilla Angitola, Calabria, Italy

Francavilla Angitola FRA Giuseppe is an advanced wastewater treatment plant in Francavilla Angitola, Calabria, Italy. Serving 280 people, it discharges treated water near the Tyrrhenian Sea coast.

Advanced 280

FIRMO_CERZITELLO

Mandatoriccio, Calabria, Italy

FIRMO_CERZITELLO is an advanced wastewater treatment plant in Mandatoriccio, Calabria, Italy, serving 2,500 people with a capacity of 500 m³/day and a discharge volume of 494.91 m³/day.

Advanced 2,500

FERRUZZANO_CANALELLO

Cananello, Calabria, Italy

Ferruzzano Canalello is a secondary wastewater treatment plant in Cananello, Calabria, Italy, serving 1,305 people with a designed capacity of 2,800 m³/day and a discharge volume of 258.34 m³/day.

Secondary 1,305

FEROLETO_ANTICO_DIPODI

Feroleto Antico, Calabria, Italy

Feroleto Antico Dipodi is an advanced wastewater treatment plant in Feroleto Antico, Calabria, Italy, serving 656 people with a designed capacity of 1000 m³/day.

Advanced 656

FAGNANO_CASTELLO_RONDINELLA

Fagnano Castello, Calabria, Italy

Fagnano Castello Rondinella is an advanced wastewater treatment plant in Calabria, Italy, serving 4,000 people. It discharges 791.86 cubic meters of treated wastewater daily.

Advanced 4,000
UtilityRadar
More
Press Esc to close · Browse by sector