83 plants indexed. Showing 30 matching current filters.
UWWTP_ORMOz is a secondary treatment plant serving Otok Virje, Croatia, with a designed capacity of 4000 m³/day and serving 5034 people.
UWWTP_ROSALNICE is a secondary treatment plant serving Metlika, Croatia, with a designed capacity of 600 m³/day and an average discharge of 43.84 m³/day.
Beli Manastir wastewater treatment plant serves the town of Beli Manastir in Osijek-Baranja County, Croatia. It has a designed capacity of 8,000 m³/day and provides secondary treatment.
Belisce wastewater treatment plant serves Belišće, Croatia, with secondary treatment. Designed capacity is 240,000 m³/day, supporting the local community and protecting regional water resources.
Benkovac wastewater treatment plant serves Grad Benkovac, Croatia, with secondary treatment. Designed capacity is 3,500 m³/day, operating under EU Urban Waste Water Treatment Directive standards.
Bjelovar wastewater treatment plant serves Grad Bjelovar, Croatia, with secondary treatment and a designed capacity of 50,000 m³/day. It discharges into the local watershed, contributing to the protection of the Sava River basin.
Buje wastewater treatment plant serves Gamboci, Croatia, with secondary treatment. Located near the Adriatic coast, it has a designed capacity of 4,000 m³/day and operates under EU Urban Waste Water Treatment Directive standards.
Buzet wastewater treatment plant serves Grad Buzet in Istria, Croatia, with secondary treatment. Designed capacity is 7,200 m³/day, operating under EU Urban Waste Water Treatment Directive.
Cakovec wastewater treatment plant serves Grad Čakovec, Croatia, with secondary treatment. It has a designed capacity of 91,000 m³/day and operates under EU Urban Waste Water Treatment Directive standards.
Daruvar wastewater treatment plant in Croatia provides secondary treatment with a designed capacity of 23,000 m³/day, serving the city of Daruvar and surrounding area.
Donji Miholjac wastewater treatment plant serves the town of Donji Miholjac in Osijek-Baranja County, Croatia. It has a designed capacity of 8,000 m³/day and provides secondary treatment.
Garesnica wastewater treatment plant serves Grad Garešnica in Croatia with secondary treatment. Designed capacity is 7,000 m³/day, operating under EU Urban Waste Water Treatment Directive.
Gospic wastewater treatment plant serves Grad Gospić, Croatia, with secondary treatment and a designed capacity of 5,200 m³/day. It is located inland, over 10 km from the coast, and discharges into local water bodies.
Ilok wastewater treatment plant serves the town of Ilok in eastern Croatia, near the Danube River. The secondary treatment facility has a designed capacity of 8,000 cubic meters per day.
Imotski wastewater treatment plant serves Glavina Donja, Croatia, with secondary treatment. Designed capacity is 10,000 cubic meters per day, supporting the local population and environment.
Jadranovo wastewater treatment plant serves the coastal town of Jadranovo, Croatia, with secondary treatment. Located near the Adriatic Sea, it supports local environmental protection.
Kaptol Komarovci is a secondary treatment plant serving Općina Kaptol, Croatia. It has a designed capacity of 1000 m³/day and operates under EU wastewater directives.
Labin wastewater treatment plant serves Grad Labin in Istria, Croatia, with secondary treatment. Located within 10 km of the Adriatic coast, it has a designed capacity of 7,500 m³/day.
Otocac wastewater treatment plant serves Otočac, Croatia, with secondary treatment. Designed capacity is 5,000 m³/day, operating under EU Urban Waste Water Treatment Directive 91/271/EEC.
Pazin wastewater treatment plant serves Grad Pazin, Croatia, with secondary treatment. It has a designed capacity of 8,000 m³/day and is located inland, protecting the local watershed.