180 plants indexed. Showing 120 matching current filters.
SAINT LAURENT DES EAUX is an advanced wastewater treatment plant in Saint-Laurent-Nouan, Centre-Val de Loire, France, serving approximately 2,079 people. It discharges treated water into the local watershed.
MONNAIE Les Champs is an advanced wastewater treatment plant in Monnaie, Centre-Val de Loire, France, serving 3,383 people. It discharges treated water into the local watershed, supporting the Loire River basin.
VERETZ Beauregard is an advanced wastewater treatment plant in Véretz, Centre-Val de Loire, France, serving 5,200 people with a designed capacity of 10,000 m³/day.
TRAINOU wastewater treatment plant serves Traînou, France, with advanced treatment for a population of 2,317. It has a designed capacity of 3,000 m³/day and discharges 413.35 m³/day.
Vernou-sur-Brenne La Justice is an advanced wastewater treatment plant in Centre-Val de Loire, France, serving 3,450 people with a design capacity of 10,000 m³/day.
LIGUEIL Rue du Paradis is an advanced wastewater treatment plant in Ligueil, Centre-Val de Loire, France. It serves a population of 2,442 with a designed capacity of 2,700 m³/day.
CHEVILLY wastewater treatment plant serves 3,000 people in Chevilly, Centre-Val de Loire, France. It provides advanced treatment and has a designed capacity of 3,000 m³/day.
GALLARDON wastewater treatment plant in Bailleau-Armenonville, Centre-Val de Loire, France, serves about 2,905 people with advanced treatment and a designed capacity of 5,800 m³/day.
CLOYES SUR LE LOIR is an advanced wastewater treatment plant in Cloyes-les-Trois-Rivières, France, serving 2,207 people. It discharges 393.73 m³/day of treated water into the local watershed.
BUZANCAIS Vilaine is an advanced wastewater treatment plant serving Buzançais, France. It treats wastewater for approximately 2,893 people with a designed capacity of 6,000 m³/day.
Saint-Dyé-sur-Loire wastewater treatment plant in Centre-Val de Loire, France, serves 3,258 people with advanced treatment. It discharges 581.22 m³/day and has a designed capacity of 7,500 m³/day.
FAY AUX LOGES wastewater treatment plant in Fay-aux-Loges, Centre-Val de Loire, France, serves 1,834 people with advanced treatment and a designed capacity of 6,000 m³/day.
FERRIERES wastewater treatment plant in Fontenay-sur-Loing, France, serves 5,446 people with advanced treatment. It discharges 971.56 m³/day and has a designed capacity of 5,500 m³/day.
JARGEAU wastewater treatment plant in Saint-Denis-de-l'Hôtel, Centre-Val de Loire, France, serves 4,466 people with advanced treatment. It has a designed capacity of 8,000 m³/day and discharges 796.73 m³/day.
MONDOUBLEAU CR 23 ET CR 10 is an advanced wastewater treatment plant in Cormenon, Centre-Val de Loire, France, serving 3,648 people with a designed capacity of 4,000 m³/day.
POILLY LEZ GIEN wastewater treatment plant serves Poilly-lez-Gien in Centre-Val de Loire, France. It provides advanced treatment for a population of 2,832 with a designed capacity of 5,000 m³/day.
Selles-sur-Cher Thizardiere is an advanced wastewater treatment plant in Selles-sur-Cher, Centre-Val de Loire, France, serving 4,424 people with a designed capacity of 8,000 m³/day.
Cléry-Saint-André wastewater treatment plant in Centre-Val de Loire, France, serves about 3,600 residents with advanced treatment. It discharges treated water into the Loire River basin, supporting local water quality.
PATAY 2 is an advanced wastewater treatment plant in Villeneuve-sur-Conie, Centre-Val de Loire, France. It serves a population of 2,400 and discharges treated water into the local watershed.
CHATILLON SUR INDRE wastewater treatment plant serves Châtillon-sur-Indre, France, with advanced treatment for a population of 1,653. The plant discharges treated water into the local watershed, contributing to the protection of the Indre River and d
UtilityRadar indexes 180 wastewater treatment plants in Centre-Val de Loire, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, VERETZ Beauregard has the highest designed capacity at 10,000 m3/day.