638 plants indexed. Showing 34 matching current filters.
SKA BERGATREUTE is an advanced wastewater treatment plant in Bergatreute, Baden-Württemberg, Germany, serving approximately 3,750 people with a designed capacity of 5,000 m³/day.
SKA BLIDERAZHOFEN is an advanced wastewater treatment plant in Christazhofen, Baden-Württemberg, Germany. It serves a population of 2,100 and has a designed capacity of 1,500 m³/day.
SKA BODNEGG is an advanced wastewater treatment plant in Rosenharz, Baden-Württemberg, Germany, serving 4,550 people. It has a designed capacity of 6,000 m³/day and discharges 817.07 m³/day of treated effluent.
SKA Dörren is an advanced wastewater treatment plant in Kißlegg, Baden-Württemberg, Germany, serving a population of 5,250. It operates under the EU Urban Waste Water Treatment Directive.
SKA Ebersbach is a closed secondary treatment plant in Ebersbach, Baden-Württemberg, Germany. It served a population of 1,656 with a designed capacity of 2,500 m³/day.
SKA Fridingen is an advanced wastewater treatment plant serving Fridingen an der Donau, Baden-Württemberg, Germany. It treats wastewater for about 4,750 people with a designed capacity of 5,300 m³/day.
SKA ILLMENSEE is a closed secondary treatment plant in Ruschweiler, Baden-Württemberg, Germany. It served 1,800 people with a designed capacity of 1,700 cubic meters per day.
SKA Königseggwald is a closed secondary treatment plant in Baden-Württemberg, Germany, serving 1,950 people. It discharged 493.50 m³/day with a designed capacity of 3,000 m³/day.
SKA Neuhausen oE is an advanced wastewater treatment plant in Neuhausen, Baden-Württemberg, Germany, serving 2,400 people. It has a designed capacity of 3,500 m³/day and discharges 608.79 m³/day.
SKA Rulfingen is a secondary treatment plant in Mengen, Baden-Württemberg, Germany, serving 1,850 people. It discharges treated wastewater into local waterways, supporting the Danube basin ecosystem.
SKA SCHEER is an advanced wastewater treatment plant in Scheer, Baden-Württemberg, Germany. It serves about 5,050 people and discharges 720.11 thousand cubic meters annually.
SKA Schönach is an advanced wastewater treatment plant serving Kleinschönach, Baden-Württemberg, Germany. It treats wastewater from around 2,050 people with a designed capacity of 2,400 m³/day.
SKA STETTEN STORZINGEN is an advanced wastewater treatment plant in Storzingen, Baden-Württemberg, Germany. It serves a population of 2,676 and discharges 768.49 m³/day of treated water.
SKA Talheim is a closed secondary treatment plant in Talheim, Baden-Württemberg, Germany, serving approximately 1,990 people with a designed capacity of 2,500 m³/day.
SKA Urbanstobel is an advanced wastewater treatment plant in Kappel, Baden-Württemberg, Germany, serving approximately 3,150 people. It discharges treated water near the coast and operates under the EU Urban Waste Water Treatment Directive.
SKA VILSINGEN is a closed secondary wastewater treatment plant in Vilsingen, Baden-Württemberg, Germany, serving a population of 1,950. It was designed for a capacity of 2,000 m³/day and discharged 493.50 m³/day.
SKA WALD is an advanced wastewater treatment plant in Wald, Baden-Württemberg, Germany, serving 2,450 people with a designed capacity of 4,100 m³/day.
SKA WOLFEGG is an advanced wastewater treatment plant in Alttann, Baden-Württemberg, Germany, serving 4,350 people. It discharges 980.69 m³/day of treated effluent into local waterways.
SKA Apflau is a wastewater treatment plant in Tettnang, Baden-Württemberg, Germany, serving approximately 6,200 people. It operates under the EU Urban Waste Water Treatment Directive.
SKA Buggensegel in Salem, Baden-Württemberg, Germany, serves approximately 15,100 people. The plant is located within 50 km of the coast and operates under the EU Urban Waste Water Treatment Directive.
UtilityRadar indexes 638 wastewater treatment plants in Baden-Württemberg, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, SKA DoeRREN has the highest designed capacity at 8,350 m3/day.