Wastewater plants in Bayern

995 plants indexed. Showing 49 matching current filters.

49 plants matching filters

Hirschberg

Tiefengrün, Bayern

Hirschberg wastewater treatment plant in Tiefengrün, Bayern, Germany, served 3,109 people with advanced treatment before closure. The plant had a designed capacity of 2,400 m³/day and discharged 786.81 m³/day.

Advanced 3,109 Low

UNTERAMMERGAU

Unterammergau, Bayern

UNTERAMMERGAU wastewater treatment plant in Bavaria, Germany, serves 1,700 people with advanced treatment. The plant is now closed, having discharged treated water into the local watershed.

Advanced 1,700 Low

BAD BAYERSOIEN

Bad Bayersoien, Bayern

Bad Bayersoien wastewater treatment plant in Bavaria, Germany, serves 1,250 people with advanced treatment. The plant is now closed, but its infrastructure supported the local community in the Ammer River watershed.

Advanced 1,250 Low

Ebermannsdorf

Ebermannsdorf, Bayern

Ebermannsdorf wastewater treatment plant in Bayern, Germany, serves a small population of 1,948 with advanced treatment. The plant is now closed.

Advanced 1,948 Low

Etzelwang

Etzelwang, Bayern

Etzelwang wastewater treatment plant in Bayern, Germany, serves a population of 1,627 with advanced treatment. The plant is now closed, having discharged 411.75 m³/day into local waters.

Advanced 1,627 Low

AUERBACH OT MICHELFELD

Auerbach in der Oberpfalz, Bayern

AUERBACH OT MICHELFELD is a closed advanced treatment plant in Auerbach in der Oberpfalz, Bavaria, Germany. It served a population of 1,623 with a designed capacity of 2,400 m³/day.

Advanced 1,623 Low

Barnau

Bärnau, Bayern

Barnau wastewater treatment plant in Bärnau, Bavaria, Germany, serves approximately 1,926 people with advanced treatment. The facility is currently closed.

Advanced 1,926 Low

AZV Schlammersdorf Vorbach

Oberbibrach, Bayern

AZV Schlammersdorf Vorbach is a closed advanced treatment plant in Oberbibrach, Bavaria, Germany. It served a population of 1,830 with a designed capacity of 2,900 m³/day.

Advanced 1,830 Low

Trabitz

Weihersberg, Bayern

Trabitz wastewater treatment plant in Weihersberg, Bayern, Germany, serves a small population of 974 with advanced treatment. The plant is currently closed.

Advanced 974 Low

Reischach

Reischach, Bayern

Reischach wastewater treatment plant in Bayern, Germany, serves a small population with advanced treatment. The plant is now closed, having discharged treated effluent into the local watershed.

Advanced 1,911 Low

Laaber OT Waldetzenberg

Edlhausen, Bayern

Laaber OT Waldetzenberg is a closed advanced wastewater treatment plant in Edlhausen, Bavaria, Germany. It served a population of 1,385 with a designed capacity of 2,500 m³/day.

Advanced 1,385 Low

Bernhardswald

Bernhardswald, Bayern

Bernhardswald wastewater treatment plant in Bavaria, Germany, serves a population of 1,929 with advanced treatment. Though currently closed, it was designed for a capacity of 6,300 m³/day and discharges 659 m³/day.

Advanced 1,929 Low

Miltach

Staning, Bayern

Miltach wastewater treatment plant in Staning, Bavaria, Germany, served 1,882 people with advanced treatment before closure. The facility discharged 563.77 cubic meters daily and had a designed capacity of 2,500 cubic meters.

Advanced 1,882 Low

Weiding

Maiering, Bayern

Weiding wastewater treatment plant in Maiering, Bavaria, Germany, serves a population of 1,610 with advanced treatment. The plant is now closed but had a designed capacity of 2,500 m³/day.

Advanced 1,610 Low

Blaibach

Kreuzbach, Bayern

Blaibach wastewater treatment plant in Kreuzbach, Germany, served a population of 1,969 with advanced treatment. The plant is now closed, having had a designed capacity of 3,000 m³/day.

Advanced 1,969 Low

Schorndorf

Knöbling, Bayern

Schorndorf wastewater treatment plant in Knöbling, Bayern, Germany, served 1,225 people with advanced treatment before closing. It discharged 310.02 m³/day and had a designed capacity of 2,750 m³/day.

Advanced 1,225 Low

Wang

Volkmannsdorf, Bayern

Wang wastewater treatment plant in Volkmannsdorf, Bavaria, Germany, serves a population of 1,312 with advanced treatment. The plant is now closed.

Advanced 1,312 Low

Weichs

Ebersbach, Bayern

Weichs wastewater treatment plant in Ebersbach, Bavaria, Germany, serves a population of 1,765 with advanced treatment. The plant is closed and has a designed capacity of 3,000 m³/day.

Advanced 1,765 Low

Niederviehbach

Lichtensee, Bayern

Niederviehbach wastewater treatment plant in Lichtensee, Bavaria, Germany, serves a population of 1,773 with advanced treatment. The plant is now closed, having had a designed capacity of 3,000 m³/day.

Advanced 1,773 Low

GERZEN

Gerzen, Bayern

GERZEN wastewater treatment plant in Gerzen, Bayern, Germany, serves a population of 1,922 with advanced treatment. The plant is now closed, having had a designed capacity of 2,800 m³/day.

Advanced 1,922 Low

Frequently asked

How many wastewater treatment plants are in Bayern?

UtilityRadar indexes 995 wastewater treatment plants in Bayern, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Bayern?

Among the indexed plants, Bernhardswald has the highest designed capacity at 6,300 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector