Wastewater plants in Bayern

995 plants indexed. Showing 986 matching current filters.

986 plants matching filters

Moorenweis

Moorenweis, Bayern

Moorenweis wastewater treatment plant in Bavaria, Germany serves about 2,500 people with advanced treatment. It discharges 656.72 cubic meters daily and has a designed capacity of 4,600 cubic meters.

Advanced 2,496 Low

Althegnenberg

Althegnenberg, Bayern

Althegnenberg wastewater treatment plant in Bavaria, Germany, serves a population of 1,920 with secondary treatment. The plant is now closed, with a designed capacity of 2,500 m³/day and an average discharge volume of 519 m³/day.

Secondary 1,920 Low

Kirchdorf ad Amper

Burghausen, Bayern

Kirchdorf ad Amper wastewater treatment plant in Burghausen, Bavaria, Germany, serves 3,452 people with advanced treatment. It discharges 896.49 cubic meters daily and has a designed capacity of 4,800 cubic meters per day.

Advanced 3,452 Low

Hohenkammer

Schlipps, Bayern

Hohenkammer wastewater treatment plant in Schlipps, Bavaria, Germany, serves 3,800 people with advanced treatment and a designed capacity of 6,000 m³/day.

Advanced 3,800 Low

Fahrenzhausen

Weng, Bayern

Fahrenzhausen wastewater treatment plant in Weng, Bayern, Germany, serves about 4,800 people with advanced treatment. It discharges 959 m³/day and has a design capacity of 6,000 m³/day.

Advanced 4,807 Low

Wang

Volkmannsdorf, Bayern

Wang wastewater treatment plant in Volkmannsdorf, Bavaria, Germany, serves a population of 1,312 with advanced treatment. The plant is now closed.

Advanced 1,312 Low

Haag ad Amper

Untermarchenbach, Bayern

Haag ad Amper wastewater treatment plant in Untermarchenbach, Bavaria, Germany, serves a population of 2,697 with advanced treatment. It has a designed capacity of 3,600 m³/day and discharges 691.18 m³/day.

Advanced 2,697 Low

Horgertshausen

Hörgertshausen, Bayern

Horgertshausen wastewater treatment plant serves the Bavarian municipality of Hörgertshausen, Germany, with secondary treatment for a population of 2,158. The plant has a designed capacity of 3,000 m³/day and discharges treated wastewater into local

Secondary 2,158 Low

Kranzberg

Kranzberg, Bayern

Kranzberg wastewater treatment plant in Bavaria, Germany serves about 4,064 people with advanced treatment. It discharges 757.90 m³/day and has a designed capacity of 4,950 m³/day.

Advanced 4,064 Low

Wolfersdorf

Berghaselbach, Bayern

Wolfersdorf wastewater treatment plant in Berghaselbach, Bavaria, Germany, serves 2,400 people with secondary treatment. The plant has a designed capacity of 3,000 m³/day and discharges 448.72 m³/day.

Secondary 2,400 Low

Mauern

Mauern, Bayern

Mauern wastewater treatment plant in Bavaria, Germany, serves 2,928 people with advanced treatment. It discharges 734.27 m³/day and has a designed capacity of 4,000 m³/day.

Advanced 2,928 Low

Langenbach

Langenbach, Bayern

Langenbach wastewater treatment plant in Bayern, Germany serves about 4,052 people with advanced treatment. It discharges 680.53 m³/day and has a designed capacity of 4,500 m³/day.

Advanced 4,052 Low

Lengdorf

Brandlengdorf, Bayern

Lengdorf wastewater treatment plant in Brandlengdorf, Bavaria, Germany, serves 2,684 people with advanced treatment. It discharges 645.58 m³/day of treated effluent into local waterways.

Advanced 2,684 Low

Sankt Wolfgang

Großschwindau, Bayern

Sankt Wolfgang wastewater treatment plant in Großschwindau, Bayern, Germany, serves a population of 3,150 with advanced treatment. It has a designed capacity of 3,800 m³/day and discharges 768.56 m³/day.

Advanced 3,150 Low

Bockhorn

Grünbach, Bayern

Bockhorn wastewater treatment plant in Grünbach, Bavaria, Germany, serves 1,649 people with secondary treatment. The plant is now closed and had a designed capacity of 4,500 m³/day.

Secondary 1,649 Low

Walpertskirchen

Walpertskirchen, Bayern

Walpertskirchen wastewater treatment plant in Bayern, Germany serves 1,766 people with secondary treatment. The plant is now closed, having had a designed capacity of 2,200 m³/day.

Secondary 1,766 Low

Fraunberg

Riding, Bayern

Fraunberg wastewater treatment plant in Riding, Bavaria, Germany serves 2,072 people with advanced treatment. It discharges 581.75 m³/day and has a designed capacity of 3,600 m³/day.

Advanced 2,072 Low

Langenpreising

Langenpreising, Bayern

Langenpreising wastewater treatment plant in Bavaria, Germany serves 2,316 people with advanced treatment. It discharges 502.80 m³/day and has a designed capacity of 3,600 m³/day.

Advanced 2,316 Low

Weichs

Ebersbach, Bayern

Weichs wastewater treatment plant in Ebersbach, Bavaria, Germany, serves a population of 1,765 with advanced treatment. The plant is closed and has a designed capacity of 3,000 m³/day.

Advanced 1,765 Low

Markt Indersdorf OT Niederroth

Sigmertshausen, Bayern

Markt Indersdorf OT Niederroth is a secondary wastewater treatment plant in Sigmertshausen, Bavaria, Germany, serving 2,275 people with a design capacity of 2,500 m³/day.

Secondary 2,275 Low

Frequently asked

How many wastewater treatment plants are in Bayern?

UtilityRadar indexes 995 wastewater treatment plants in Bayern, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Bayern?

Among the indexed plants, Hohenkammer has the highest designed capacity at 6,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector