Wastewater plants in Bayern

995 plants indexed.

995 plants

ZV Gennach Kirchweihtal S Westendorf

Unterostendorf, Bayern

ZV Gennach Kirchweihtal S Westendorf is an advanced wastewater treatment plant in Unterostendorf, Bavaria, Germany, serving approximately 7,000 people with a designed capacity of 8,000 m³/day.

Advanced 7,000 Low

WAAL

Bronnen, Bayern

WAAL wastewater treatment plant in Bronnen, Bavaria, Germany, serves 1,308 people with advanced treatment. The plant is now closed, having had a designed capacity of 2,500 m³/day.

Advanced 1,308 Low

Kaltental

Blonhofen, Bayern

Kaltental wastewater treatment plant serves the community of Blonhofen in Bavaria, Germany, with secondary treatment for a population of 2,230. The plant has a designed capacity of 2,500 m³/day and discharges 564.36 m³/day.

Secondary 2,230 Low

Rosshaupten

Roßhaupten, Bayern

Rosshaupten wastewater treatment plant in Roßhaupten, Bavaria, Germany, serves 2,462 people with advanced treatment. It discharges 570.22 m³/day and has a designed capacity of 4,700 m³/day.

Advanced 2,462 Low

Rieden am Forggensee

Rieden am Forggensee, Bayern

Rieden am Forggensee wastewater treatment plant in Bayern, Germany, serves a population of 1,283 with secondary treatment. The plant is now closed, having discharged treated wastewater into the local watershed.

Secondary 1,283 Low

Wertach

Oy-Mittelberg, Bayern

Wertach wastewater treatment plant in Oy-Mittelberg, Bavaria, Germany, serves a population of 3,546 with advanced treatment. It discharges 911.45 m³/day and has a designed capacity of 7,500 m³/day.

Advanced 3,546 Low

Missen Wilhams

Missen-Wilhams, Bayern

Missen Wilhams wastewater treatment plant in Missen-Wilhams, Bavaria, Germany, serves about 3,700 people with advanced treatment. It discharges 776 m³/day of treated effluent, operating under the EU Urban Waste Water Treatment Directive.

Advanced 3,717 Low

Wildpoldsried

Haldenwang, Bayern

Wildpoldsried wastewater treatment plant serves the Haldenwang area in Bavaria, Germany. It provides secondary treatment for a population of 2,120 with a designed capacity of 2,600 m³/day.

Secondary 2,120 Low

Schesslitz OT Wiesengiech

Scheßlitz, Bayern

Schesslitz OT Wiesengiech is a secondary treatment plant serving about 2,000 people in Scheßlitz, Bavaria, Germany. It discharges treated wastewater into the local watershed.

Secondary 2,000 Low

Schesslitz OT Wiesengiech

Scheßlitz, Bayern

Schesslitz OT Wiesengiech is a secondary wastewater treatment plant in Scheßlitz, Bavaria, Germany. It serves approximately 2,000 people and has a designed capacity of 2,500 m³/day.

Secondary 2,000 Low

Hirschfeld

Hirschfeld, Bayern

Hirschfeld wastewater treatment plant in Bayern, Germany serves about 3,239 people with advanced treatment. It discharges 819.71 cubic meters daily and has a designed capacity of 4,400 cubic meters.

Advanced 3,239 Low

Tettau

Sattelgrund, Bayern

Tettau wastewater treatment plant in Sattelgrund, Bayern, Germany, serves 2,200 people with advanced treatment. It discharges 556.77 m³/day and has a designed capacity of 4,500 m³/day.

Advanced 2,200 Low

Reichenbach

Reichenbach, Bayern

Reichenbach wastewater treatment plant in Bayern, Germany serves 727 people with secondary treatment. The plant is now closed, having had a designed capacity of 1,100 m³/day and a discharge volume of 183.99 m³/day.

Secondary 727 Low

Teuschnitz

Wickendorf, Bayern

Teuschnitz wastewater treatment plant in Wickendorf, Bayern, Germany, serves a population of 1,702 with advanced treatment. The facility is now closed.

Advanced 1,702 Low

Weidhausen

Weidhausen b.Coburg, Bayern

Weidhausen wastewater treatment plant in Bavaria, Germany, serves about 3,183 people with advanced treatment. It discharges 890.23 m³/day and has a designed capacity of 6,000 m³/day.

Advanced 3,183 Low

Sesslach

Seßlach, Bayern

Sesslach wastewater treatment plant serves the town of Seßlach in Bavaria, Germany, treating municipal wastewater for a population of 3,428 with secondary treatment.

Secondary 3,428 Low

Grossgarnstadt

Großgarnstadt, Bayern

Grossgarnstadt wastewater treatment plant in Bayern, Germany serves 1,100 people with secondary treatment. It is now closed, having had a designed capacity of 1,400 m³/day.

Secondary 1,100 Low

Bad Staffelstein OT Schwabthal

Bad Staffelstein, Bayern

Bad Staffelstein OT Schwabthal wastewater treatment plant in Bavaria, Germany, serves 1,600 people with advanced treatment. The plant is now closed, having had a designed capacity of 2,000 m³/day.

Advanced 1,600 Low

LEUTENBACH

Dietzhof, Bayern

LEUTENBACH wastewater treatment plant in Dietzhof, Bavaria, Germany serves 2,155 people with advanced treatment. It has a designed capacity of 2,600 m³/day and discharges 545.38 m³/day.

Advanced 2,155 Low

Markt Rattelsdorf

Freudeneck, Bayern

Markt Rattelsdorf wastewater treatment plant in Freudeneck, Bavaria, Germany, serves 3,813 people with advanced treatment and a designed capacity of 4,600 m³/day.

Advanced 3,813 Low

Frequently asked

How many wastewater treatment plants are in Bayern?

UtilityRadar indexes 995 wastewater treatment plants in Bayern, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Bayern?

Among the indexed plants, ZV Gennach Kirchweihtal S Westendorf has the highest designed capacity at 8,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector