Wastewater plants in Schleswig-Holstein

186 plants indexed. Showing 48 matching current filters.

48 plants matching filters

Lasbek

Barkhorst, Schleswig-Holstein

Lasbek wastewater treatment plant in Barkhorst, Schleswig-Holstein, Germany, serves a population of 1,865 with secondary treatment. The plant is now closed.

Secondary 1,865

Todendorf Altenfelde

Todendorf, Schleswig-Holstein

Todendorf Altenfelde is a closed secondary treatment plant in Todendorf, Schleswig-Holstein, Germany. It served 1,130 people with a designed capacity of 3,000 m³/day.

Secondary 1,130

Meddewade

Meddewade, Schleswig-Holstein

Meddewade wastewater treatment plant in Schleswig-Holstein, Germany, served 762 people with advanced treatment before closure. The facility discharged into local waterways near the Trave River basin.

Advanced 762

Hamberge Buurredder

Hamberge, Schleswig-Holstein

Hamberge Buurredder is a closed secondary treatment plant in Hamberge, Schleswig-Holstein, Germany. It served 1,500 people with a designed capacity of 1,500 m³/day.

Secondary 1,500

Wacken

Wacken, Schleswig-Holstein

Wacken wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,810 people with secondary treatment. The plant is closed and discharges to local water bodies.

Secondary 1,810

Vaale Rumklinth

Vaale, Schleswig-Holstein

Vaale Rumklinth is a closed secondary treatment plant in Vaale, Schleswig-Holstein, Germany. It served 1,200 people with a designed capacity of 2,000 m³/day and discharged 303.69 m³/day.

Secondary 1,200

Oldendorf

Krummendiek, Schleswig-Holstein

Oldendorf wastewater treatment plant in Krummendiek, Schleswig-Holstein, Germany, serves a population of 1,124 with secondary treatment. The plant is now closed.

Secondary 1,124

Oelixdorf

Kollmoor, Schleswig-Holstein

Oelixdorf wastewater treatment plant in Kollmoor, Schleswig-Holstein, Germany, serves 1,630 people with secondary treatment. The plant is now closed, with a designed capacity of 4,000 m³/day and an average discharge volume of 412.51 m³/day.

Secondary 1,630

Munsterdorf

Münsterdorf, Schleswig-Holstein

Munsterdorf wastewater treatment plant in Schleswig-Holstein, Germany, serves a population of 1,943 with secondary treatment. The facility is now closed.

Secondary 1,943

Dageling

Dägeling, Schleswig-Holstein

Dageling wastewater treatment plant in Dägeling, Schleswig-Holstein, Germany, serves 1,278 people with advanced treatment. It is now closed and discharged treated wastewater near the North Sea coast.

Advanced 1,278

Brokdorf

Brokdorf, Schleswig-Holstein

Brokdorf wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,662 people with advanced treatment. The plant is closed and located within 10 km of the coast, discharging treated water into the Elbe River.

Advanced 1,662

Todesfelde

Todesfelde, Schleswig-Holstein

Todesfelde wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,320 people with secondary treatment. The plant is now closed, with a designed capacity of 2,000 m³/day and an average discharge volume of 334 m³/day.

Secondary 1,320

Seth

Seth, Schleswig-Holstein

Seth wastewater treatment plant in Schleswig-Holstein, Germany, serves a population of 1,977 with advanced treatment. The plant is now closed, having had a designed capacity of 2,600 m³/day.

Advanced 1,977

Wanderup

Wanderup, Schleswig-Holstein

Wanderup wastewater treatment plant in Schleswig-Holstein, Germany, serves a small population with advanced treatment. Though now closed, it reflects the high standards of the EU Urban Waste Water Treatment Directive.

Advanced 1,821

Sterup

Sterup, Schleswig-Holstein

Sterup wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,010 people with advanced treatment. The facility is closed but historically discharged into the Geltinger Bucht coastal area.

Advanced 1,010

Sieverstedt

Stenderup, Schleswig-Holstein

Sieverstedt wastewater treatment plant in Stenderup, Schleswig-Holstein, Germany, served a population of 1,098 with advanced treatment before closure. The facility discharged 277.88 m³/day and had a designed capacity of 2,150 m³/day.

Advanced 1,098

Oeversee

Oeversee, Schleswig-Holstein

Oeversee wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,587 people with secondary treatment. The plant is now closed, having discharged into the Treene river system.

Secondary 1,587

Munkbrarup

Munkbrarup, Schleswig-Holstein

Munkbrarup wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,800 people with secondary treatment. The closed facility had a designed capacity of 2,000 m³/day and discharged 455.54 m³/day.

Secondary 1,800

Maasholm

Exhöft, Schleswig-Holstein

Maasholm wastewater treatment plant in Exhöft, Schleswig-Holstein, Germany, serves 1,950 people with advanced treatment. It is now closed, with a design capacity of 2,500 m³/day and discharge volume of 493.5 m³/day.

Advanced 1,950

Ellingstedt

Ellingstedt, Schleswig-Holstein

Ellingstedt wastewater treatment plant in Schleswig-Holstein, Germany, serves a small population of 1,086 with secondary treatment. The plant is now closed, having discharged treated effluent into local water bodies.

Secondary 1,086

Frequently asked

How many wastewater treatment plants are in Schleswig-Holstein?

UtilityRadar indexes 186 wastewater treatment plants in Schleswig-Holstein, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Schleswig-Holstein?

Among the indexed plants, Oelixdorf has the highest designed capacity at 4,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector