Wastewater plants in Thüringen

141 plants indexed. Showing 25 matching current filters.

25 plants matching filters

Altenfeld

Großbreitenbach, Thüringen

Altenfeld wastewater treatment plant in Großbreitenbach, Thüringen, Germany, serves a population of 2,109 with advanced treatment. The plant is now closed, having had a designed capacity of 2,500 m³/day.

Advanced 2,109 Low

Bibra

Bibra, Thüringen

Bibra wastewater treatment plant in Thüringen, Germany, serves 1,767 people with secondary treatment. The plant is now closed, having had a designed capacity of 3,500 m³/day and a discharge volume of 447.19 m³/day.

Secondary 1,767 Low

Buttstedt

Büttstedt, Thüringen

Buttstedt wastewater treatment plant in Büttstedt, Thüringen, Germany, serves 1,620 people with secondary treatment. The plant is now closed, with a designed capacity of 2,600 m³/day and annual discharge volume of 409.98 m³.

Secondary 1,620 Low

Dachwig

Dachwig, Thüringen

Dachwig wastewater treatment plant in Thüringen, Germany, serves about 3,595 people with advanced treatment. Now closed, it had a designed capacity of 4,999 m³/day and discharged 909.81 m³/day.

Advanced 3,595 Low

Dorndorf Steudnitz

Dorndorf-Steudnitz, Thüringen

Dorndorf Steudnitz wastewater treatment plant in Thüringen, Germany, served a population of 1,788 with advanced treatment before closure. It had a designed capacity of 3,500 m³/day and discharged 452.5 m³/day.

Advanced 1,788 Low

Ebeleben

Ebeleben, Thüringen

Ebeleben wastewater treatment plant in Thüringen, Germany, serves a small population of 1,946 with advanced treatment. The facility is currently closed.

Advanced 1,946 Low

Friedatal_Grosstopfer

Großtöpfer, Thüringen

Friedatal_Grosstopfer is a closed advanced treatment plant in Großtöpfer, Thüringen, Germany. It served a population of 3,452 with a designed capacity of 4,200 m³/day.

Advanced 3,452 Low

Grafenthal

Probstzella, Thüringen

Grafenthal wastewater treatment plant in Probstzella, Thüringen, Germany, served a population of 2,145 with advanced treatment before its closure. The facility had a designed capacity of 3,900 m³/day and discharged 542.85 m³/day.

Advanced 2,145 Low

Grossbodungen

Bleicherode, Thüringen

Grossbodungen wastewater treatment plant in Bleicherode, Thüringen, Germany, is a closed advanced treatment facility that served a population of 499. It had a designed capacity of 5,000 m³/day and discharged 126.29 m³/day.

Advanced 499 Low

Grossmehlra

Schlotheim, Thüringen

Grossmehlra wastewater treatment plant in Schlotheim, Thüringen, Germany, serves 934 people with secondary treatment. The plant is now closed.

Secondary 934 Low

Hainspitz

Aubitz, Thüringen

Hainspitz wastewater treatment plant in Aubitz, Thüringen, Germany, serves a population of 1,550 with secondary treatment. The plant is now closed, having had a designed capacity of 2,400 m³/day.

Secondary 1,550 Low

Hohenleuben

Hohenleuben, Thüringen

Hohenleuben wastewater treatment plant in Thüringen, Germany serves 1,446 people with advanced treatment. The plant is now closed and discharged 365.95 m³/day into local waterways.

Advanced 1,446 Low

Isserstedt

Jena, Thüringen

Isserstedt wastewater treatment plant in Jena, Thüringen, Germany, served 1,942 people with advanced treatment before closure. The facility had a designed capacity of 2,500 m³/day and discharged 491.47 m³/day.

Advanced 1,942 Low

Juchsen

Jüchsen, Thüringen

Juchsen wastewater treatment plant in Jüchsen, Thüringen, Germany, is a secondary treatment facility serving 1,534 people. Now closed, it had a designed capacity of 2,200 m³/day and discharged 388.22 m³/day.

Secondary 1,534 Low

Kerspleben

Erfurt, Thüringen

Kerspleben wastewater treatment plant in Erfurt, Thüringen, Germany, served 2,077 people with secondary treatment before closure. It had a designed capacity of 3,000 m³/day and discharged 525.64 m³/day.

Secondary 2,077 Low

Leutenthal

Leutenthal, Thüringen

Leutenthal wastewater treatment plant in Thüringen, Germany serves a small population of 1,783 with secondary treatment. The plant is now closed and discharges 388.30 m³/day.

Secondary 1,783 Low

Magdala

Magdala, Thüringen

Magdala wastewater treatment plant in Thüringen, Germany, serves 1,385 people with advanced treatment. The plant is currently closed and discharges 350.51 m³/day.

Advanced 1,385 Low

Masserberg

Masserberg, Thüringen

Masserberg wastewater treatment plant in Thüringen, Germany, serves a small population of 1,309 with advanced treatment. The plant is now closed, having had a designed capacity of 2,400 m³/day.

Advanced 1,309 Low

Menteroda

Menteroda, Thüringen

Menteroda wastewater treatment plant in Thüringen, Germany, serves a small population of 1,723 with secondary treatment. The plant is now closed.

Secondary 1,723 Low

Mohlsdorf

Mohlsdorf, Thüringen

Mohlsdorf wastewater treatment plant in Thüringen, Germany, is a closed advanced treatment facility that served a population of 2,317 with a designed capacity of 3,000 m³/day.

Advanced 2,317 Low
UtilityRadar
More
Press Esc to close · Advanced search