Wastewater plants in Germany

4,257 plants indexed. Showing 330 matching current filters.

Germany operates one of the most comprehensive wastewater networks in the world. Treatment is mandated at municipal level under the Federal Water Act and EU UWWTD. UtilityRadar indexes 4257 wastewater treatment plants in Germany with a combined designed capacity of 6,530,097 m³/day. The largest plant on file is Frankfurt Am Main _ Flughafen, treating 90,000 m³/day.

Germany operates one of the most comprehensive wastewater networks in the world. Treatment is mandated at municipal level under the Federal Water Act and EU UWWTD.

Plant directory coverage

UtilityRadar's directory currently lists 4,257 wastewater treatment plants across Germany. Together these plants represent a combined designed capacity of approximately 6,530,097 m³/day.

Treatment levels

By treatment level, the directory contains 1000 advanced, 383 secondary-treatment plants. Secondary treatment (typically activated sludge with biological nutrient removal) is the most common standard.

Largest plant

The largest plant indexed for Germany is Frankfurt Am Main _ Flughafen, with a designed capacity of 90,000 m³/day.

About our data

Plant records are aggregated from publicly available regulatory data (US EPA ECHO, EU UWWTD reporting, national water authority publications), augmented by direct operator information and verified via Google Maps coordinates. Each record includes location, treatment level, capacity where known, operator and operational status. To browse plants by treatment level worldwide, see our secondary and advanced filter views, or read our guide to how sewage treatment works.

330 plants matching filters

Oldendorf

Krummendiek, Schleswig-Holstein

Oldendorf wastewater treatment plant in Krummendiek, Schleswig-Holstein, Germany, serves a population of 1,124 with secondary treatment. The plant is now closed.

Secondary 1,124 Low

Oelixdorf

Kollmoor, Schleswig-Holstein

Oelixdorf wastewater treatment plant in Kollmoor, Schleswig-Holstein, Germany, serves 1,630 people with secondary treatment. The plant is now closed, with a designed capacity of 4,000 m³/day and an average discharge volume of 412.51 m³/day.

Secondary 1,630 Low

Munsterdorf

Münsterdorf, Schleswig-Holstein

Munsterdorf wastewater treatment plant in Schleswig-Holstein, Germany, serves a population of 1,943 with secondary treatment. The facility is now closed.

Secondary 1,943 Low

Lagerdorf

Lägerdorf, Schleswig-Holstein

Lagerdorf wastewater treatment plant in Lägerdorf, Schleswig-Holstein, Germany, serves a population of 3,327 with advanced treatment. It discharges 360.25 m³/day and has a designed capacity of 9,200 m³/day.

Advanced 3,327 Low

Kremperheide

Krempermoor, Schleswig-Holstein

Kremperheide wastewater treatment plant in Krempermoor, Schleswig-Holstein, Germany, serves about 3,028 people with advanced treatment. It discharges treated effluent near the North Sea coast.

Advanced 3,028 Medium

Hohenlockstedt

Hohenlockstedt, Schleswig-Holstein

Hohenlockstedt wastewater treatment plant in Schleswig-Holstein, Germany, serves about 8,800 people with advanced treatment. It discharges treated water into local waterways, supporting the region's environmental quality.

Advanced 8,763 Low

Hohenaspe

Hohenaspe, Schleswig-Holstein

Hohenaspe wastewater treatment plant in Schleswig-Holstein, Germany, serves 2,040 people with advanced treatment. It discharges 516.27 m³/day and has a designed capacity of 2,700 m³/day.

Advanced 2,040 Low

Dageling

Dägeling, Schleswig-Holstein

Dageling wastewater treatment plant in Dägeling, Schleswig-Holstein, Germany, serves 1,278 people with advanced treatment. It is now closed and discharged treated wastewater near the North Sea coast.

Advanced 1,278 Low

Brokstedt

Brokstedt, Schleswig-Holstein

Brokstedt wastewater treatment plant in Schleswig-Holstein, Germany, serves about 3,060 people with advanced treatment. It discharges 725 m³/day and has a designed capacity of 4,000 m³/day.

Advanced 3,060 Low

Brokdorf

Brokdorf, Schleswig-Holstein

Brokdorf wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,662 people with advanced treatment. The plant is closed and located within 10 km of the coast, discharging treated water into the Elbe River.

Advanced 1,662 Medium

Krempe

Borsfleth, Schleswig-Holstein

Krempe wastewater treatment plant in Borsfleth, Schleswig-Holstein, Germany serves about 3,566 people with advanced treatment. It discharges treated water near the coast, supporting local water quality.

Advanced 3,566 Medium

Beidenfleth

Beidenfleth, Schleswig-Holstein

Beidenfleth wastewater treatment plant in Schleswig-Holstein, Germany, serves about 2,024 people with advanced treatment. It discharges 512.23 m³/day of treated effluent and is located near the North Sea coast.

Advanced 2,024 Medium

Trappenkamp

Daldorf, Schleswig-Holstein

Trappenkamp wastewater treatment plant in Daldorf, Schleswig-Holstein, Germany, serves 5,000 people with advanced treatment. It discharges 879.09 m³/day and has a designed capacity of 14,000 m³/day.

Advanced 5,000 Low

Todesfelde

Todesfelde, Schleswig-Holstein

Todesfelde wastewater treatment plant in Schleswig-Holstein, Germany, serves 1,320 people with secondary treatment. The plant is now closed, with a designed capacity of 2,000 m³/day and an average discharge volume of 334 m³/day.

Secondary 1,320 Low

Schmalfeld

Schmalfeld, Schleswig-Holstein

Schmalfeld wastewater treatment plant in Schleswig-Holstein, Germany, serves about 2,300 people with secondary treatment. The plant has a designed capacity of 3,000 m³/day and discharges 321 m³/day.

Secondary 2,293 Low

Rickling

Fehrenbötel, Schleswig-Holstein

Rickling wastewater treatment plant in Fehrenbötel, Schleswig-Holstein, Germany, serves 3,419 people with advanced treatment. It discharges 514 m³/day and has a designed capacity of 4,200 m³/day.

Advanced 3,419 Low

Lentfohrden

Lentföhrden, Schleswig-Holstein

Lentfohrden wastewater treatment plant in Lentföhrden, Schleswig-Holstein, Germany, serves about 2,500 people with advanced treatment. It discharges treated water inland, contributing to local water quality.

Advanced 2,457 Low

Hartenholm

Hartenholm, Schleswig-Holstein

Hartenholm wastewater treatment plant in Schleswig-Holstein, Germany, serves about 2,864 people with secondary treatment. It has a designed capacity of 4,000 m³/day and discharges 347 m³/day.

Secondary 2,864 Low

Grossenaspe

Großenaspe, Schleswig-Holstein

Grossenaspe wastewater treatment plant in Großenaspe, Schleswig-Holstein, Germany, serves 2,353 people with secondary treatment. It discharges 740 m³/day and has a design capacity of 2,600 m³/day.

Secondary 2,353 Low

Bornhoved

Bornhöved, Schleswig-Holstein

Bornhoved wastewater treatment plant in Bornhöved, Schleswig-Holstein, Germany, serves about 3,470 people with advanced treatment. It discharges 556.74 cubic meters per day and has a designed capacity of 6,000 cubic meters per day.

Advanced 3,470 Low

Frequently asked

How many wastewater treatment plants are in Germany?

UtilityRadar indexes 4257 wastewater treatment plants in Germany, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Germany?

Among the indexed plants, Trappenkamp has the highest designed capacity at 14,000 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector