81 plants indexed. Showing 80 matching current filters.
FOSSO GAUTERIO is a secondary wastewater treatment plant in Lettomanoppello, Abruzzo, Italy, serving 1,800 people with a designed capacity of 1,200 m³/day and a discharge volume of 520.55 m³/day.
GIARRICCIA wastewater treatment plant in Monteodorisio, Abruzzo, Italy, serves 2,500 people with secondary treatment. It discharges 494.91 m³/day and has a designed capacity of 3,000 m³/day.
Guardamonti is a secondary wastewater treatment plant serving Collesalardo, Abruzzo, Italy. It treats wastewater for a population of 3,300 with a designed capacity of 3,000 m³/day.
IMP_S_PIETRO_PACENTRO is an advanced wastewater treatment plant serving Pacentro, Abruzzo, Italy. It treats wastewater for a population of 2,646 with a designed capacity of 3,000 m³/day.
LOC_MULINO_VECCHIO_ALFEDENA is an advanced wastewater treatment plant in Alfedena, Abruzzo, Italy. It serves a population of 4,288 with a designed capacity of 6,000 m³/day.
Molinella wastewater treatment plant serves Torino di Sangro, Italy, with secondary treatment for a population of 4,900. It discharges approximately 970 cubic meters of treated effluent daily, located within 10 km of the Adriatic coast.
The Mosciano Costa del Monte wastewater treatment plant serves Mosciano Sant'Angelo, Italy, treating municipal wastewater for a population of 2,500. It operates with secondary treatment and is located near the Adriatic coast.
Mosciano Ripoli wastewater treatment plant serves Mosciano Sant'Angelo, Abruzzo, Italy. This secondary treatment facility handles a population equivalent of 4,000 and discharges treated wastewater near the Adriatic coast.
Mosciano Stazione wastewater treatment plant serves 2,400 people in Mosciano Sant'Angelo, Abruzzo, Italy. It provides secondary treatment and discharges treated effluent near the Adriatic coast.
NERETO_CAPOLUOGO is a secondary wastewater treatment plant in Nereto, Abruzzo, Italy, serving 4,800 people with a designed capacity of 7,500 m³/day and a discharge volume of 950.23 m³/day.
Notaresco Zona Industriale is a secondary treatment plant serving 2,000 people in Pianura Vomano, Abruzzo, Italy. It discharges 395.93 cubic meters of treated wastewater daily, with a designed capacity of 9,000 cubic meters.
PANICE wastewater treatment plant in Atri, Abruzzo, Italy, serves 1,200 people with secondary treatment. It discharges 197.26 m³/day and is located within 10 km of the Adriatic coast.
PERO DEI SANTI is a secondary wastewater treatment plant in Morino, Abruzzo, Italy, serving a population of 670. It discharges 132.64 cubic meters of treated wastewater daily, with a designed capacity of 450 cubic meters.
PESCOCANALE_BASSO is a secondary treatment plant serving 253 people in Pescocanale, Abruzzo, Italy. It discharges 50.09 m³/day of treated wastewater, operating under EU Urban Waste Water Treatment Directive standards.
PETRELLA LIRI wastewater treatment plant serves Cappadocia, Italy, treating wastewater from approximately 1,510 people. The plant provides primary treatment and discharges into local water bodies.
PIANA DEL MOLINO is a secondary wastewater treatment plant in Paglieta, Abruzzo, Italy, serving 2,000 people. It discharges 395.93 m³/day of treated effluent and is located within 10 km of the Adriatic coast.
Pianella Capoluogo is a secondary wastewater treatment plant serving 2,400 people in Pianella, Abruzzo, Italy. It discharges treated effluent into the local watershed, contributing to the protection of the Adriatic Sea.
RAIANO wastewater treatment plant in Raiano, Abruzzo, Italy, serves a population of 1,047 with advanced treatment. It discharges 207.27 cubic meters of treated wastewater daily.
S_EGIDIO_CAPOLUOGO is a secondary wastewater treatment plant serving Sant'Egidio alla Vibrata, Abruzzo, Italy. It treats wastewater from approximately 4,700 people with a discharge volume of 930.43 units.
S_Egidio_Villa_Marchetti is a secondary wastewater treatment plant serving Sant'Egidio alla Vibrata, Italy. It treats wastewater for approximately 3,050 people with a designed capacity of 8,000 m³/day.