209 plants indexed. Showing 186 matching current filters.
ABRIOLA_CDA_PIERFAONE is a secondary wastewater treatment plant serving Abriola, Basilicata, Italy. It treats wastewater for a small population of 50 with a designed capacity of 300 m³/day.
Abriola Cda Pontegiardino is a secondary wastewater treatment plant serving 1,253 people in Abriola, Basilicata, Italy. It discharges 248.05 m³/day and has a designed capacity of 2,500 m³/day.
ACCETTURA_CDA_LAGO is a secondary wastewater treatment plant serving Accettura, Basilicata, Italy. It treats approximately 483 m³/day with a designed capacity of 3,000 m³/day, supporting a population of 2,440.
ACERENZA_CDA_GIACHELLA is a secondary wastewater treatment plant in Acerenza, Basilicata, Italy, serving a population of 300. It has a designed capacity of 500 m³/day and discharges 59.39 m³/day.
ALIANO_DI_PANTANO is a secondary wastewater treatment plant serving Aliano, Basilicata, Italy. It treats wastewater for a small population of 100 with a designed capacity of 2000 m³/day.
ANZI_CDA_RAIA is a secondary treatment plant in Anzi, Basilicata, Italy, serving about 1,559 people. It discharges treated wastewater into local water bodies, supporting regional sanitation.
ANZI_CDA_S_DONATO is a secondary wastewater treatment plant in Anzi, Basilicata, Italy, serving 371 people with a designed capacity of 500 m³/day and a discharge volume of 73.45 m³/day.
ARMENTO PONTE DEL CASALE is a secondary treatment plant serving Armento, Basilicata, Italy. It treats wastewater for 800 people with a designed capacity of 2000 m³/day.
ATELLA_LEVATA_ is a secondary wastewater treatment plant serving Atella, Basilicata, Italy. It treats wastewater for 3,610 people with a designed capacity of 2,300 m³/day and a discharge volume of 714.65 m³/day.
Avigliano Serra Ventaruli is a secondary wastewater treatment plant serving 376 people in Avigliano, Basilicata, Italy. It discharges 74.44 cubic meters of treated wastewater daily.
BALVANO_CDA_S_LUCIA is a secondary treatment plant serving 1,900 people in Balvano, Basilicata, Italy. It discharges 376.13 m³/day of treated wastewater into local water bodies.
BANZI_CDA_BANZULLO is a secondary wastewater treatment plant serving Banzi, Basilicata, Italy. It treats wastewater for approximately 1,520 people with a designed capacity of 2,100 m³/day.
BARILE_ZONA_PIP is a secondary treatment plant in Barile, Basilicata, Italy, serving a small population of 30. It discharges 5.94 m³/day of treated wastewater into the local watershed.
BELLA_CDA_AIROLA is a secondary wastewater treatment plant in Bella, Basilicata, Italy, serving a small population of 80.
BELLA_CDA_PASCHIERO_CAMPO_SPORTIVO1 is a secondary treatment plant in Bella, Basilicata, Italy, serving 3,300 people. It discharges 653.28 m³/day of treated wastewater.
BELLA_RE_PUPILLO is a secondary treatment plant serving Bella, Basilicata, Italy. It treats wastewater for 1,200 people with a designed capacity of 2,000 m³/day and discharges 237.56 m³/day.
Bella San Cataldo Bagni wastewater treatment plant serves the San Cataldo area in Basilicata, Italy. It provides secondary treatment for a small population of 80, with a designed capacity of 600 cubic meters per day.
BELLA SAN CATALDO ZIPPARIELLO is a secondary wastewater treatment plant serving 390 people in San Cataldo, Basilicata, Italy. It discharges 77.21 m³/day of treated effluent into the local watershed.
Bella Stazione Bella Muro Fiumara is a secondary treatment plant serving 90 people in Bella, Basilicata, Italy. It discharges 17.82 cubic meters daily and operates under EU regulations.
BRIENZA_CDA_PRATO is a secondary wastewater treatment plant in Brienza, Basilicata, Italy, serving approximately 4,100 people. It discharges 811.65 cubic meters of treated wastewater daily.