460 plants indexed. Showing 55 matching current filters.
VILLADOSE_LOC_CAMBIO_SUD is a secondary treatment plant serving 56 people in Villadose, Veneto, Italy. It discharges 11.09 m³/day of treated wastewater into local waterways.
VILLADOSE_LOC_CAMBIO_NORD is a secondary treatment plant serving 139 people in Villadose, Veneto, Italy. It discharges 27.52 m³/day of treated wastewater into local waterways.
Torre di Mosto Via Xola is a secondary wastewater treatment plant in Torre di Mosto, Veneto, Italy, serving a population of 2,664. It discharges treated water into the local water system, supporting environmental protection in the region.
SILEA VIA DUCA D'AOSTA LOC S. ELENA is a secondary treatment plant in Casale sul Sile, Veneto, Italy, serving 1,545 people. It discharges treated wastewater near the Sile River, within 10 km of the Adriatic coast.
Teglio Veneto Loc Cintello is a secondary treatment plant serving 300 people in Cintello, Veneto, Italy. It discharges treated wastewater into the local water system, contributing to the region's environmental management.
TEGLIO_VENETO_CAPOLUOGO is a secondary wastewater treatment plant in Teglio Veneto, Veneto, Italy. It serves a population of 800 with a designed capacity of 800 cubic meters per day.
SANTO STINO DI LIVENZA LA SALUTE 81 VIA ZECCHETTO is a secondary treatment plant serving 340 people in San Stino di Livenza, Veneto, Italy. It discharges 67.31 m³/day of treated wastewater into the local water system.
SALGAREDA VIA CALLURBANA is a secondary wastewater treatment plant in Campobernardo, Veneto, Italy, serving 240 people. It discharges 47.51 m³/day of treated effluent and is located within 10 km of the coast.
Noventa di Piave Capoluogo Via Torino is a secondary wastewater treatment plant serving 4,274 people in Noventa di Piave, Veneto, Italy. It discharges 846.10 cubic meters of treated effluent daily, with a designed capacity of 4,500 cubic meters.
MEOLO_MARTEGGIA_VIA_DEI_PAOLI is a secondary treatment plant in Meolo, Veneto, Italy, serving 106 people with a designed capacity of 400 m³/day and a discharge volume of 20.98 m³/day.
Impianto di Depurazione di Falzè Vicolo Cadorna is a secondary treatment plant serving 55 people in Falzè, Veneto, Italy. It discharges treated wastewater into the local water system.
Impianto Depurazione di Maserada is a secondary treatment plant serving 200 people in Maserada sul Piave, Veneto, Italy. It discharges 39.59 m³/day of treated wastewater.
GAIARINE_FRZ_FRANCENIGO is a secondary treatment plant serving Albina, Veneto, Italy.
FSS_IF01_FITODEPURAZIONE is a secondary treatment plant serving 270 people in Fratta, Veneto, Italy. It discharges 53.45 m³/day of treated wastewater into the local water system.
Fossalta di Piave Cadorna is a secondary wastewater treatment plant serving Fossalta di Piave, Veneto, Italy. It treats municipal wastewater for a population of 3,186 with a designed capacity of 3,600 m³/day.
Fontanelle Via Dei Morti is a secondary treatment plant serving 245 people in Lutrano, Veneto, Italy. It discharges 48.50 m³/day of treated wastewater into the local water system.
Fitodepurazione di Trevignano Vicolo Venezia is a secondary treatment plant in Trevignano, Veneto, Italy, serving a small population of 39.
Fitodepurazione di Trevignano Via Montebianco is a secondary treatment plant in Falzè, Veneto, Italy, serving 54 people with a designed capacity of 170 m³/day and a discharge volume of 10.69 m³/day.
PORTORUARO VIA ALDO MORO PEEP 6 1 RONCHI is a secondary treatment plant in Portogruaro, Veneto, Italy, serving 450 people with a designed capacity of 450 m³/day and a discharge volume of 89.08 m³/day.
Portogruaro Via Piero Della Francesca is a secondary treatment plant serving 150 people in Portogruaro, Veneto, Italy. It discharges 29.70 m³/day of treated wastewater, with a designed capacity of 150 m³/day.
UtilityRadar indexes 460 wastewater treatment plants in Veneto, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, NOVENTA_DI_PIAVE_CAPOLUOGO_VIA_TORINO has the highest designed capacity at 4,500 m3/day.