Wastewater plants in Veneto

460 plants indexed. Showing 180 matching current filters.

180 plants matching filters

ROVERCHIARA_LOC_CAPPAFREDDA

Roverchiara, Veneto

ROVERCHIARA_LOC_CAPPAFREDDA is a secondary treatment plant in Roverchiara, Veneto, Italy, serving a small population of 20. It discharges 3.96 m³/day of treated wastewater.

Secondary 20 Low

ROVERCHIARA_LOC_CAPOLUOGO

Roverchiaretta, Veneto

ROVERCHIARA_LOC_CAPOLUOGO is a secondary wastewater treatment plant in Roverchiaretta, Veneto, Italy, serving a small population of 65. It discharges 12.87 m³/day of treated effluent.

Secondary 65 Low

ROTZO_LOC_VALLE_SABAUS

Rotzo, Veneto

ROTZO_LOC_VALLE_SABAUS is a secondary treatment plant in Rotzo, Veneto, Italy, serving 322 people with a designed capacity of 400 m³/day. It discharges 63.75 m³/day of treated wastewater into local water bodies.

Secondary 322 Low

ROTZO_LOC_VAL_ORCHENTAL

Rotzo, Veneto

ROTZO_LOC_VAL_ORCHENTAL is a secondary wastewater treatment plant in Rotzo, Veneto, Italy, serving a population of 322. It discharges 63.75 cubic meters of treated effluent daily.

Secondary 322 Low

ROTZO_LOC_CASTELLETTO

Rotzo, Veneto

ROTZO_LOC_CASTELLETTO is a secondary treatment plant serving 40 people in Rotzo, Veneto, Italy.

Secondary 40 Low

ROANA_VIA_S_ANTONIO

Mezzaselva, Veneto

ROANA VIA S ANTONIO is a secondary wastewater treatment plant in Mezzaselva, Veneto, Italy, serving a small population of 32. It discharges 6.34 m³/day and has a designed capacity of 40 m³/day.

Secondary 32 Low

SILEA_VIA_DUCA_D_AOSTA_LOC_S_ELENA

Casale sul Sile, Veneto

SILEA VIA DUCA D'AOSTA LOC S. ELENA is a secondary treatment plant in Casale sul Sile, Veneto, Italy, serving 1,545 people. It discharges treated wastewater near the Sile River, within 10 km of the Adriatic coast.

Secondary 1,545 Medium

TEGLIO_VENETO_LOC_CINTELLO

Cintello, Veneto

Teglio Veneto Loc Cintello is a secondary treatment plant serving 300 people in Cintello, Veneto, Italy. It discharges treated wastewater into the local water system, contributing to the region's environmental management.

Secondary 300 Low

TEGLIO_VENETO_CAPOLUOGO

Teglio Veneto, Veneto

TEGLIO_VENETO_CAPOLUOGO is a secondary wastewater treatment plant in Teglio Veneto, Veneto, Italy. It serves a population of 800 with a designed capacity of 800 cubic meters per day.

Secondary 800 Low

SORGA_LOC_CAPOLUOGO

Torre di Masino, Veneto

SORGA_LOC_CAPOLUOGO is a secondary wastewater treatment plant in Torre di Masino, Veneto, Italy, serving 871 people with a designed capacity of 800 m³/day.

Secondary 871 Low

SANTO_STINO_DI_LIVENZA_LA_SALUTE_81_VIA_ZECCHETTO

San Stino di Livenza, Veneto

SANTO STINO DI LIVENZA LA SALUTE 81 VIA ZECCHETTO is a secondary treatment plant serving 340 people in San Stino di Livenza, Veneto, Italy. It discharges 67.31 m³/day of treated wastewater into the local water system.

Secondary 340 Low

SALGAREDA_VIA_CALLURBANA

Campobernardo, Veneto

SALGAREDA VIA CALLURBANA is a secondary wastewater treatment plant in Campobernardo, Veneto, Italy, serving 240 people. It discharges 47.51 m³/day of treated effluent and is located within 10 km of the coast.

Secondary 240 Medium

ORGIANO_PILASTRO

Cagnano, Veneto

ORGIANO_PILASTRO is a secondary wastewater treatment plant in Cagnano, Veneto, Italy, serving 410 people with a designed capacity of 500 m³/day and a discharge volume of 81.17 m³/day.

Secondary 410 Low

NOVENTA_DI_PIAVE_CAPOLUOGO_VIA_TORINO

Noventa di Piave, Veneto

Noventa di Piave Capoluogo Via Torino is a secondary wastewater treatment plant serving 4,274 people in Noventa di Piave, Veneto, Italy. It discharges 846.10 cubic meters of treated effluent daily, with a designed capacity of 4,500 cubic meters.

Secondary 4,274 Medium

NOGARA_LOC_MONTALTO_VIA_OLMO

Nogara, Veneto

NOGARA_LOC_MONTALTO_VIA_OLMO is a secondary treatment plant in Nogara, Veneto, Italy, serving 400 people with a designed capacity of 400 m³/day and a discharge volume of 79.19 m³/day.

Secondary 400 Low

NOGARA_LOC_CAMPALANO

Nogara, Veneto

NOGARA_LOC_CAMPALANO is a secondary wastewater treatment plant in Nogara, Veneto, Italy, serving approximately 400 people with a designed capacity of 400 m³/day.

Secondary 400 Low

NANTO_FRAZ_PONTE

Ponte di Mossano, Veneto

NANTO_FRAZ_PONTE is a secondary wastewater treatment plant in Ponte di Mossano, Veneto, Italy, serving 1,865 people with a designed capacity of 2,000 m³/day.

Secondary 1,865 Low

MOSSANO_VIA_ORE_FRAZ_PONTE

Ponte di Barbarano, Veneto

MOSSANO_VIA_ORE_FRAZ_PONTE is a secondary wastewater treatment plant serving 540 people in Ponte di Barbarano, Veneto, Italy.

Secondary 540 Low

MEOLO_MARTEGGIA_VIA_DEI_PAOLI

Meolo, Veneto

MEOLO_MARTEGGIA_VIA_DEI_PAOLI is a secondary treatment plant in Meolo, Veneto, Italy, serving 106 people with a designed capacity of 400 m³/day and a discharge volume of 20.98 m³/day.

Secondary 106 Medium

IMPIANTO_DI_FITODEPURAZIONE_VIA_DEI_RIZZI_MASER

Coste di Maser, Veneto

Impianto di Fitodepurazione Via dei Rizzi Maser is a secondary treatment plant serving 74 people in Coste di Maser, Veneto, Italy. It discharges 14.65 m³/day of treated wastewater.

Secondary 74 Low

Frequently asked

How many wastewater treatment plants are in Veneto?

UtilityRadar indexes 460 wastewater treatment plants in Veneto, with treatment level, capacity, operator and discharge data on each record.

What is the largest wastewater treatment plant in Veneto?

Among the indexed plants, NOVENTA_DI_PIAVE_CAPOLUOGO_VIA_TORINO has the highest designed capacity at 4,500 m3/day.

UtilityRadar
More
Press Esc to close · Browse by sector