460 plants indexed.
Trecenta Via Berettare is an advanced wastewater treatment plant in Trecenta, Veneto, Italy, serving 3,700 people with a designed capacity of 5,550 m³/day and a discharge volume of 732.47 m³/day.
Torri di Quartesolo Via I Maggio is an advanced wastewater treatment plant in Torri di Quartesolo, Veneto, Italy. It serves a population of 2,197 with a designed capacity of 2,500 cubic meters per day.
Torreglia Via Boschette is an advanced wastewater treatment plant serving the town of Torreglia in Veneto, Italy. It treats wastewater for a population of 3,532 with a designed capacity of 5,000 cubic meters per day.
Torre di Mosto Via Xola is a secondary wastewater treatment plant in Torre di Mosto, Veneto, Italy, serving a population of 2,664. It discharges treated water into the local water system, supporting environmental protection in the region.
ROVIGO_TANGENZIALE_EST is an advanced wastewater treatment plant serving 2,030 people in Rovigo, Veneto, Italy. It discharges 401.87 m³/day and has a designed capacity of 3,200 m³/day.
ROVERCHIARA LOC CAPPAFREDDA ZONA PRODUTTIVA D2 is a secondary treatment plant in Roverchiara, Veneto, Italy. It serves a small population of 65 and has a designed capacity of 200 m³/day.
ROVERCHIARA_LOC_CAPPAFREDDA is a secondary treatment plant in Roverchiara, Veneto, Italy, serving a small population of 20. It discharges 3.96 m³/day of treated wastewater.
ROVERCHIARA_LOC_CAPOLUOGO is a secondary wastewater treatment plant in Roverchiaretta, Veneto, Italy, serving a small population of 65. It discharges 12.87 m³/day of treated effluent.
ROTZO_LOC_VALLE_SABAUS is a secondary treatment plant in Rotzo, Veneto, Italy, serving 322 people with a designed capacity of 400 m³/day. It discharges 63.75 m³/day of treated wastewater into local water bodies.
ROTZO_LOC_VAL_ORCHENTAL is a secondary wastewater treatment plant in Rotzo, Veneto, Italy, serving a population of 322. It discharges 63.75 cubic meters of treated effluent daily.
ROTZO_LOC_CASTELLETTO is a secondary treatment plant serving 40 people in Rotzo, Veneto, Italy.
ROCCA PIETORE MASARE is an advanced wastewater treatment plant in Rocca Pietore, Veneto, Italy, serving a population of 2,189. It discharges 433.34 cubic meters of treated wastewater daily.
ROANA_FRAZ_MEZZASELVA is an advanced wastewater treatment plant in Mezzaselva, Veneto, Italy. It serves a population of 403 with a designed capacity of 500 m³/day and discharges 79.78 m³/day.
ROANA VIA S ANTONIO is a secondary wastewater treatment plant in Mezzaselva, Veneto, Italy, serving a small population of 32. It discharges 6.34 m³/day and has a designed capacity of 40 m³/day.
SILEA VIA DUCA D'AOSTA LOC S. ELENA is a secondary treatment plant in Casale sul Sile, Veneto, Italy, serving 1,545 people. It discharges treated wastewater near the Sile River, within 10 km of the Adriatic coast.
SEDICO_OSELETE is an advanced wastewater treatment plant in Santa Giustina, Veneto, Italy. It serves approximately 4,962 people with a design capacity of 6,000 m³/day and discharges 982.30 m³/day.
SEDICO_MELI is an advanced wastewater treatment plant serving 992 people in Sedico, Veneto, Italy. It has a designed capacity of 1,200 m³/day and discharges 196.38 m³/day of treated effluent.
SEDICO_MASTELLA_MAS is an advanced wastewater treatment plant serving 2,274 people in Ponte Mas, Veneto, Italy. It operates with a designed capacity of 2,000 m³/day and discharges 450.17 m³/day.
The Sant'Urbano Loc Ca Brusa wastewater treatment plant in Padova, Veneto, Italy, serves a population of 2,690 with advanced treatment. It discharges 532.52 cubic meters per day and has a designed capacity of 4,600 cubic meters per day.
Teglio Veneto Loc Cintello is a secondary treatment plant serving 300 people in Cintello, Veneto, Italy. It discharges treated wastewater into the local water system, contributing to the region's environmental management.
UtilityRadar indexes 460 wastewater treatment plants in Veneto, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, SEDICO_OSELETE has the highest designed capacity at 6,000 m3/day.