460 plants indexed. Showing 180 matching current filters.
SANTO STINO DI LIVENZA LA SALUTE 81 VIA ZECCHETTO is a secondary treatment plant serving 340 people in San Stino di Livenza, Veneto, Italy. It discharges 67.31 m³/day of treated wastewater into the local water system.
SALGAREDA VIA CALLURBANA is a secondary wastewater treatment plant in Campobernardo, Veneto, Italy, serving 240 people. It discharges 47.51 m³/day of treated effluent and is located within 10 km of the coast.
ORGIANO_PILASTRO is a secondary wastewater treatment plant in Cagnano, Veneto, Italy, serving 410 people with a designed capacity of 500 m³/day and a discharge volume of 81.17 m³/day.
Noventa di Piave Capoluogo Via Torino is a secondary wastewater treatment plant serving 4,274 people in Noventa di Piave, Veneto, Italy. It discharges 846.10 cubic meters of treated effluent daily, with a designed capacity of 4,500 cubic meters.
NOGARA_LOC_MONTALTO_VIA_OLMO is a secondary treatment plant in Nogara, Veneto, Italy, serving 400 people with a designed capacity of 400 m³/day and a discharge volume of 79.19 m³/day.
NOGARA_LOC_CAMPALANO is a secondary wastewater treatment plant in Nogara, Veneto, Italy, serving approximately 400 people with a designed capacity of 400 m³/day.
NANTO_FRAZ_PONTE is a secondary wastewater treatment plant in Ponte di Mossano, Veneto, Italy, serving 1,865 people with a designed capacity of 2,000 m³/day.
MOSSANO_VIA_ORE_FRAZ_PONTE is a secondary wastewater treatment plant serving 540 people in Ponte di Barbarano, Veneto, Italy.
MEOLO_MARTEGGIA_VIA_DEI_PAOLI is a secondary treatment plant in Meolo, Veneto, Italy, serving 106 people with a designed capacity of 400 m³/day and a discharge volume of 20.98 m³/day.
Impianto di Fitodepurazione Via dei Rizzi Maser is a secondary treatment plant serving 74 people in Coste di Maser, Veneto, Italy. It discharges 14.65 m³/day of treated wastewater.
Impianto di Depurazione di Falzè Vicolo Cadorna is a secondary treatment plant serving 55 people in Falzè, Veneto, Italy. It discharges treated wastewater into the local water system.
Impianto Depurazione di Maserada is a secondary treatment plant serving 200 people in Maserada sul Piave, Veneto, Italy. It discharges 39.59 m³/day of treated wastewater.
GRANTORTO_VIA_S_ANTONIO is a secondary wastewater treatment plant serving Grantorto, Veneto, Italy. It treats wastewater from a population of 3,034 with a designed capacity of 8,000 m³/day.
GAZZO_PADOVANO_VIA_CADORNA_LOC_GROSSA is a secondary wastewater treatment plant in Grossa, Veneto, Italy, serving approximately 3,217 people with a designed capacity of 3,500 m³/day.
GAIARINE_FRZ_FRANCENIGO is a secondary treatment plant serving Albina, Veneto, Italy.
FSS_IF01_FITODEPURAZIONE is a secondary treatment plant serving 270 people in Fratta, Veneto, Italy. It discharges 53.45 m³/day of treated wastewater into the local water system.
Fossalta di Piave Cadorna is a secondary wastewater treatment plant serving Fossalta di Piave, Veneto, Italy. It treats municipal wastewater for a population of 3,186 with a designed capacity of 3,600 m³/day.
ROANA_LOC_VALDASSA is a secondary treatment plant serving Canove, Veneto, Italy. It treats wastewater for 125 people with a designed capacity of 200 m³/day and discharges 24.75 m³/day.
ROANA_LOC_STRADA_CIMITERO is a secondary wastewater treatment plant in Canove, Veneto, Italy, serving a small population of 16.
ROANA_LOC_CESUNA is a secondary wastewater treatment plant in Cesuna, Veneto, Italy, serving 75 people with a designed capacity of 120 m³/day and a discharge volume of 14.85 m³/day.
UtilityRadar indexes 460 wastewater treatment plants in Veneto, with treatment level, capacity, operator and discharge data on each record.
Among the indexed plants, GRANTORTO_VIA_S_ANTONIO has the highest designed capacity at 8,000 m3/day.